Unit sized transfer batch scheduling in an automated two-machine flow-line cell with one transport agent
- 16 November 2005
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 29 (1-2) , 178-183
Abstract
No abstract availableKeywords
This publication has 16 references indexed in Scilit:
- Lot streaming in the two-machine flow shop with setup timesAnnals of Operations Research, 1995
- Optimal lot streaming for multiple products in a two-machine flow shopEuropean Journal of Operational Research, 1995
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times SeparatedJournal of the Operational Research Society, 1994
- Two- and three-machine flow shop scheduling problems with equal sized transfer batchesInternational Journal of Production Research, 1992
- Unit sized transfer batch scheduling with setup timesComputers & Industrial Engineering, 1992
- Sequency on two and three machines with setup, processing and removal times separatedInternational Journal of Production Research, 1983
- Optimal Two-Stage Production Scheduling with Setup Times SeparatedA I I E Transactions, 1979
- The Complexity of Flowshop and Jobshop SchedulingMathematics of Operations Research, 1976
- Sequencing n Jobs on Two Machines with Arbitrary Time LagsManagement Science, 1959
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954