Ferda Can Çetinkaya
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Ferda Can Çetinkaya has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
Hale Akkocaoğlu Çatmakaş
Cankaya Univ, Dept Ind Engn, TR-06790 Ankara, Turkey
2 shared publicationsMeral Azizoglu
2 shared publicationsAbdül Kadir Görür
Çankaya University
1 shared publicationAtıl Kurt
1 shared publication- Ayyuce Aydemir-Karadag
Department of Industrial Engineering, Faculty of Engineering, Gazi University, Ankara, Turkiye
1 shared publication M.SInan Kayaligi̇l
1 shared publication
Latest Publications
- 22 August 2026
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 222
Dedicated parallel flow shop scheduling with line availability constraints
- 22 August 2026
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 222
Dedicated parallel flow shop scheduling with line availability constraints
- 1 January 2021
- Published by Growing Science in International Journal of Industrial Engineering Computations
- Vol. 12 (3) , 273-292
Customer order scheduling with job-based processing on a single-machine to minimize the total completion time
This study considers a customer order scheduling (COS) problem in which each customer requests a variety of products (jobs) processed on a single flexible machine, such as the computer numerical control (CNC) machine. A sequence-independent setup for the machine is needed before processing each product. All products in a customer order are delivered to the customer when they are processed. The product ordered by a customer and completed as the last product in the order defines the customer order’s completion time. We aim to find the optimal schedule of the customer orders and the products to minimize the customer orders’ total completion time. We have studied this customer order scheduling problem with a job-based processing approach in which the same products from different customer orders form a product lot and are processed successively without being intermingled with other products. We have developed two mixed-integer linear programming models capable of solving the small and medium-sized problem instances optimally and a heuristic algorithm for large-sized problem instances. Our empirical study results show that our proposed tabu search algorithm provides optimal or near-optimal solutions in a very short time. We have also compared the job-based and order-based processing approaches for both setup and no-setup cases and observed that the job-based processing approach yields better results when jobs have setup times.
- 1 January 2021
- Published by Growing Science in International Journal of Industrial Engineering Computations
- Vol. 12 (3) , 273-292
Customer order scheduling with job-based processing on a single-machine to minimize the total completion time
This study considers a customer order scheduling (COS) problem in which each customer requests a variety of products (jobs) processed on a single flexible machine, such as the computer numerical control (CNC) machine. A sequence-independent setup for the machine is needed before processing each product. All products in a customer order are delivered to the customer when they are processed. The product ordered by a customer and completed as the last product in the order defines the customer order’s completion time. We aim to find the optimal schedule of the customer orders and the products to minimize the customer orders’ total completion time. We have studied this customer order scheduling problem with a job-based processing approach in which the same products from different customer orders form a product lot and are processed successively without being intermingled with other products. We have developed two mixed-integer linear programming models capable of solving the small and medium-sized problem instances optimally and a heuristic algorithm for large-sized problem instances. Our empirical study results show that our proposed tabu search algorithm provides optimal or near-optimal solutions in a very short time. We have also compared the job-based and order-based processing approaches for both setup and no-setup cases and observed that the job-based processing approach yields better results when jobs have setup times.
- Open Access
- 1 May 2019
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 30 (1) , 78-93
SINGLE-MACHINE SCHEDULING OF THE INDIVISIBLE MULTI-OPERATION JOBS
SINGLE-MACHINE SCHEDULING OF THE INDIVISIBLE MULTI-OPERATION JOBS
- 1 May 2019
- Published by Stellenbosch University in South African Journal of Industrial Engineering
- Vol. 30 (1) , 78-93
Open AccessSINGLE-MACHINE SCHEDULING OF THE INDIVISIBLE MULTI-OPERATION JOBS
SINGLE-MACHINE SCHEDULING OF THE INDIVISIBLE MULTI-OPERATION JOBS
- 1 January 2018
- Published by Inderscience Publishers in European J. of Industrial Engineering
- Vol. 12 (3) , 405-441
Solution approaches to the blood distribution problem of the Turkish Red Crescent
This paper considers the blood distribution problem that includes irradiation centres, urgent demands, and product availability in Turkey, Central Anatolian Regional Blood Center of the Turkish Red Crescent. To address the problem, we develop a mixed integer linear program with two objectives: maximising the demand satisfaction and minimising total time travelled by the vehicles. We propose two decomposition-based heuristic solution approaches. The results of our experiments have revealed that the model cannot solve even small sized instances in reasonable times; however, the heuristic solution approaches are appropriate for solving complex real life problems. [Received: 5 May 2017; Revised: 21 December 2017; Accepted: 9 February 2018]
- 1 January 2018
- Published by Inderscience Publishers in European J. of Industrial Engineering
- Vol. 12 (3) , 405-441
Solution approaches to the blood distribution problem of the Turkish Red Crescent
This paper considers the blood distribution problem that includes irradiation centres, urgent demands, and product availability in Turkey, Central Anatolian Regional Blood Center of the Turkish Red Crescent. To address the problem, we develop a mixed integer linear program with two objectives: maximising the demand satisfaction and minimising total time travelled by the vehicles. We propose two decomposition-based heuristic solution approaches. The results of our experiments have revealed that the model cannot solve even small sized instances in reasonable times; however, the heuristic solution approaches are appropriate for solving complex real life problems. [Received: 5 May 2017; Revised: 21 December 2017; Accepted: 9 February 2018]
- 1 January 2015
- Published by Inderscience Publishers in European J. of Industrial Engineering
- Vol. 9 (4) , 450
LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource
In this study, we consider a multi-mode resource allocation problem with a single non-renewable resource. We assume the resource is released at defined time points and at defined quantities. We also assume that the activity costs are charged once they are completed. Our aim is to minimise the project completion time. We formulate the problem as a pure integer programming model and show that it is strongly NP-hard. We find lower bounds by pure and mixed integer linear programming relaxations of the model and develop three heuristic procedures based on those relaxations. The results of our computational study have revealed the satisfactory performances of our lower bounds and heuristic procedures. [Received 7 December 2011; Revised 13 April 2013; Revised 4 February 2014; Accepted 11 April 2014]
- 1 January 2015
- Published by Inderscience Publishers in European J. of Industrial Engineering
- Vol. 9 (4) , 450
LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource
In this study, we consider a multi-mode resource allocation problem with a single non-renewable resource. We assume the resource is released at defined time points and at defined quantities. We also assume that the activity costs are charged once they are completed. Our aim is to minimise the project completion time. We formulate the problem as a pure integer programming model and show that it is strongly NP-hard. We find lower bounds by pure and mixed integer linear programming relaxations of the model and develop three heuristic procedures based on those relaxations. The results of our computational study have revealed the satisfactory performances of our lower bounds and heuristic procedures. [Received 7 December 2011; Revised 13 April 2013; Revised 4 February 2014; Accepted 11 April 2014]
- 29 December 2009
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 49 (9-12) , 1161-1173
Lot streaming in a two-machine mixed shop
- 29 December 2009
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 49 (9-12) , 1161-1173
Lot streaming in a two-machine mixed shop
- 16 November 2005
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 29 (1-2) , 178-183
Unit sized transfer batch scheduling in an automated two-machine flow-line cell with one transport agent
- 16 November 2005
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 29 (1-2) , 178-183
Unit sized transfer batch scheduling in an automated two-machine flow-line cell with one transport agent
- 1 April 1992
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 22 (2) , 177-183
Unit sized transfer batch scheduling with setup times
- 1 April 1992
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 22 (2) , 177-183
Unit sized transfer batch scheduling with setup times