Valuation of strategic network flexibility in development of toll road projects
- 1 September 2008
- journal article
- research article
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 26 (9) , 979-990
Abstract
A reliable, cost‐effective and safe transportation system is essential to economic growth. To keep pace with demands for network capacity, revenue‐generating projects are increasingly being used to complement the current procurement practices and lessen the pressure on public finances. In such transportation networks where there exists a mix of free access links and links with user fees, network interconnectivity is an important component of project valuation. A bilevel stochastic recourse model for valuating network flexibility is formulated. A key component of the model is consideration of network‐based managerial flexibility in context of the upper level project valuation objective and the lower level network user equilibrium solution under demand uncertainty. The results from a test network, for which a closed form solution is possible, indicate that the value of network flexibility directly depends on initial network conditions, variance in future travel demand and toll pricing decisions.Keywords
This publication has 25 references indexed in Scilit:
- Competition between highway operators: Can we expect toll differentiation?Papers in Regional Science, 2005
- Optimal Toll Design Problem in Dynamic Traffic Networks with Joint Route and Departure Time ChoiceTransportation Research Record: Journal of the Transportation Research Board, 2005
- Pricing, Capacity Choice, and Financing in Transportation NetworksJournal of Regional Science, 2004
- Mean-Variance Model for the Build-Operate-Transfer Scheme Under Demand UncertaintyTransportation Research Record: Journal of the Transportation Research Board, 2003
- A real options approach to valuing strategic flexibility in uncertain construction projectsConstruction Management and Economics, 2002
- An option pricing-based model for evaluating the financial viability of privatized infrastructure projectsConstruction Management and Economics, 2002
- Assessing Financial Feasibility of a Build–Operate–Transfer Project Under Uncertain DemandTransportation Research Record: Journal of the Transportation Research Board, 2001
- Entry and Exit Decisions under UncertaintyJournal of Political Economy, 1989
- An algorithm for quadratic programmingNaval Research Logistics Quarterly, 1956
- ROAD PAPER. SOME THEORETICAL ASPECTS OF ROAD TRAFFIC RESEARCH.Proceedings of the Institution of Civil Engineers, 1952