Effect of limited capacity on optimal planning parameters for a multi-item production system with setup times and advance demand information
Open Access
- 23 August 2018
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 57 (6) , 1892-1913
Abstract
An analytical production/inventory model to optimise the planning parameters lot-size, safety stock and planned lead time is developed for a stochastic single-stage production system with multiple items and limited capacity. Based on queuing analysis, the influence of item specific lot-sizes on the production lead time distribution is modelled. Applying stochastic advance demand information, the expected values for finished-goods-inventory, backorders and service level are explicitly stated. Numerical optimisation is applied to solve the respective cost minimisation problem and a solution heuristic is developed to support this approach. A numerical study provides managerial insights concerning capacity limitation effects on the optimal planning parameters. Higher shop loads, i.e. tighter capacity constraints, are found to significantly increase optimal lot-size and optimal safety stock. Safety stock and planned lead time are substitutes, an increase of both leads to higher FGI and lower backorders, however, the specific trade-off depends on the demand information quality. A sensitivity analysis investigating other (non-) financial system parameters is conducted as well. The main contribution of this paper is that the interaction of different planning parameters, i.e. lot-size, safety stock and planned lead time, for different items is simultaneously studied for a capacity constrained production/inventory system.Keywords
Funding Information
- Austrian Research Promotion Agency
- Österreichische Forschungsförderungsgesellschaft (858642)
This publication has 50 references indexed in Scilit:
- Simultaneous determination of lot size and production rate at capacity-constrained multiple-product systemsFlexible Services and Manufacturing Journal, 2011
- Production-inventory systems with imperfect advance demand information and updatingNaval Research Logistics (NRL), 2011
- Safety stock or safety lead time: coping with unreliability in demand and supplyInternational Journal of Production Research, 2010
- A capacity constrained production-inventory system with stochastic demand and production timesInternational Journal of Production Research, 2009
- Kanban-based pull systems with advance demand informationInternational Journal of Production Research, 2009
- Optimal supply planning in MRP environments for assembly systems with random component procurement timesInternational Journal of Production Research, 2008
- The Effect of Lead Time Uncertainty on Safety StocksDecision Sciences, 2004
- Setup cost reduction in (Q, r) policy with lot size, setup time and lead-time interactionsJournal of the Operational Research Society, 2000
- Parameters affecting the effectiveness of MRP systems: A reviewInternational Journal of Production Research, 1998
- Lot size dependent lead times in a Q,R inventory systemInternational Journal of Production Research, 1995