Collaborative variable neighborhood search for multi-objective distributed scheduling in two-stage hybrid flow shop with sequence-dependent setup times
Open Access
- 20 September 2022
- journal article
- research article
- Published by Springer Nature in Scientific Reports
- Vol. 12 (1) , 1-19
Abstract
Distributed scheduling is seldom investigated in hybrid flow shops. In this study, distributed two-stage hybrid flow shop scheduling problem (DTHFSP) with sequence-dependent setup times is considered. A collaborative variable neighborhood search (CVNS) is proposed to simultaneously minimize total tardiness and makespan. DTHFSP is simplified by incorporating factory assignment into machine assignment of a prefixed stage, and its solution is newly represented with a machine assignment string and a scheduling string. CVNS consists of two cooperated variable neighborhood search (VNS) algorithms, and neighborhood structures and global search have collaborated in each VNS. Eight neighborhood structures and two global search operators are defined to produce new solutions. The current solution is periodically replaced with a member of the archive farthest from it. Experiments are conducted , and the computational results validate that CVNS has good advantages over the considered DTHFSP.Keywords
Funding Information
- the Research Initiation Foundation of Anhui Polytechnic University (2022YQQ002)
- Anhui Polytechnic University Research Project (Xjky2022002)
- Anhui Polytechnic University - Jiujiang District Industrial Collaborative Innovation Special Fund Project (2022cyxtb6)
- Joint Project of NFSC and Guangdong Big Data Science Center (U1611262)
- the Open Research Fund of AnHui Province Key Laboratory of Detection Technology and Energy Saving Devices of AnHui Polytechnic University (JCKJ2021A06)
This publication has 73 references indexed in Scilit:
- An efficient tabu search algorithm for the distributed permutation flowshop scheduling problemInternational Journal of Production Research, 2013
- A heuristic method for two-stage hybrid flow shop with dedicated machinesComputers & Operations Research, 2013
- Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespanApplied Soft Computing, 2011
- Scheduling two-stage hybrid flow shop with availability constraintsComputers & Operations Research, 2006
- A Hybrid Method for the Planning and SchedulingConstraints, 2005
- Satisfying due-dates in large multi-factory supply chainsIIE Transactions, 2002
- A fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation, 2002
- Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approachIEEE Transactions on Evolutionary Computation, 1999
- A review of scheduling research involving setup considerationsOmega, 1999
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988