A heuristic method for two-stage hybrid flow shop with dedicated machines
Authors:
- Shijin WangSWShijin Wang
- Ming LiuMLMing Liu
- 1 January 2013
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 40 (1) , 438-450
Abstract
No abstract availableFunding Information
- National Science Foundation of China (71101106, 71171149)
- NSFC major program (71090404/71090400)
This publication has 20 references indexed in Scilit:
- Two-stage hybrid flow shop with precedence constraints and parallel machines at second stageComputers & Operations Research, 2012
- A note on the two-stage hybrid flow shop problem with dedicated machinesOptimization Letters, 2011
- Minimizing total completion time in two-stage hybrid flow shop with dedicated machinesComputers & Operations Research, 2011
- The hybrid flow shop scheduling problemEuropean Journal of Operational Research, 2010
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspectiveComputers & Operations Research, 2010
- Minimum weighted number of tardy jobs on an m-machine flow-shop with a critical machineEuropean Journal of Operational Research, 2010
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion timesComputers & Operations Research, 2009
- Modeling realistic hybrid flexible flowshop scheduling problemsComputers & Operations Research, 2008
- Optimal Scheduling of a Two-stage Hybrid Flow ShopMathematical Methods of Operations Research, 2006
- Scheduling two-stage hybrid flow shop with availability constraintsComputers & Operations Research, 2006