Availability and throughput of unreliable, unbuffered production lines with non-homogeneous deterministic processing times
Authors:
- 1 January 2008
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 46 (20) , 5651-5677
Abstract
This paper studies production lines composed of several serial machines which are subject to random operation-dependent failures. The production lines have no intermediate buffers between adjacent machines. Machines have different deterministic processing times. The purpose of this paper is to propose analytical models to assess steady-state availability and throughput of such lines. Thousands of production line configurations have been experimented to compare the performance of the proposed approach to approximate existing techniques. A general simulation model was developed and statistical tests carried out to prove that the proposed approach is exact and robust to model unreliable, unbuffered, and non-homogeneous production lines.Keywords
This publication has 14 references indexed in Scilit:
- Transient throughput analysis for a series type system of machines in terms of alternating renewal processesEuropean Journal of Operational Research, 2004
- Productivity of synchronized serial production lines with flexible reserve capacityInternational Journal of Production Research, 2004
- Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failuresEuropean Journal of Operational Research, 1997
- Manufacturing flow line systems: a review of models and analytical resultsQueueing Systems, 1992
- Production Rate of Transfer Lines Without Buffer StorageIIE Transactions, 1990
- Approximate analysis of transfer lines with unreliable machines and finite buffersIEEE Transactions on Automatic Control, 1989
- Representation and analysis of transfer lines with machines that have different processing ratesAnnals of Operations Research, 1987
- A General Model of a Production Line with Intermediate Buffer and Station BreakdownIIE Transactions, 1987
- Two-stage production lines with a single repair crewInternational Journal of Production Research, 1984
- PREDICTION OF THE EFFICIENCY OF PRODUCTION SYSTEMS WITHOUT INTERNAL STORAGEInternational Journal of Production Research, 1967