Development of a Performance Index Model for Evaluation of BIM-Based Stakeholder Management Using Fuzzy Synthetic Evaluation
Open Access
Abstract
A continuous evaluation of the stakeholder management process can be achieved using definitive key performance indicators (KPIs). An exhaustive literature survey in this direction provided a set of 26 indicators assessed through a questionnaire survey for their possible implications on the stakeholder management process. The survey was conducted among 55 respondents with experience in using building information modeling (BIM) in mega-construction projects. The data were initially analyzed through factor analysis to establish six KPIs. Fuzzy synthetic evaluation (FSE) was used to evaluate the index values of the established KPIs to assess their importance levels. The results presented the KPIs in decreasing order of their index values: asset performance (4.27), open innovation (4.04), project O&M expenses (3.97), design process efficiency (3.95), project execution efficiency (3.90), and stakeholder concerns (3.59). The results generated a stakeholder management process assessment framework and model that provides a clear insight into using an indicator in measuring the specific stakeholder management dimension. The findings of this work can provide definite insight amongst planning managers about the stakeholder management process through the posited indicators. Further, they can adopt measures to improve the stakeholder management process in their respective projects.Keywords
This publication has 63 references indexed in Scilit:
- BIM and Quantity Surveying2017
- Using structural equation modelling (SEM) to understand the relationships among critical success factors (CSFs) for stakeholder management in constructionEngineering, Construction and Architectural Management, 2017
- Understanding effects of BIM on collaborative design and construction: An empirical study in ChinaInternational Journal of Project Management, 2017
- Review of energy efficiency initiatives and regulations for residential buildings in IndiaRenewable and Sustainable Energy Reviews, 2016
- Application, Advantages, and Methods Associated with Using BIM in Commercial ConstructionInternational Journal of Construction Education and Research, 2014
- Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projectsInternational Journal of Project Management, 2010
- Critical success criteria for mass house building projects in developing countriesInternational Journal of Project Management, 2008
- Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi studyConstruction Management and Economics, 2007
- Letter to the EditorConstruction Management and Economics, 2006
- Analysis of factors influencing project cost estimating practiceConstruction Management and Economics, 2000