Abhay Tawalare
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Abhay Tawalare has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
- Sulakshya Gaur
Department of Civil Engineering, Visvesvaraya National Institute of Technology, Nagpur, India
5 shared publications Boeing Laishram
Associate Professor, Dept. of Civil Engineering, Indian Institute of Technology Guwahati, Guwahati, Assam 781039, India
4 shared publicationsA. Iyer
1 shared publicationAjinkya Umberje
Visvesvaraya National Institute of Technology
1 shared publication- Amit Kumar
Visvesvaraya National Institute of Technology
1 shared publication Arava Sai Sreekar
Visvesvaraya National Institute of Technology
1 shared publication
Latest Publications
- 2 September 2026
- Published by Springer Nature
- p. 95-108
Analysing the Impact of Structural Fracture on the Redundancy of Steel Truss Bridge
- 2 September 2026
- Published by Springer Nature
- p. 95-108
Analysing the Impact of Structural Fracture on the Redundancy of Steel Truss Bridge
- 7 May 2026
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- p. 1-24
Unveiling the impact of current HR strategies on employee attraction, retention, and productivity in the Indian construction industry: emerging challenges
Purpose: In the rapidly evolving Indian construction industry, addressing the shortage of skilled professionals and improving talent attraction, retention, and productivity is crucial for sustaining growth. Targeted research on the impact of current HR practices on employee well-being, attraction, retention, and productivity is essential, and this study aims to identify existing strategies and evaluate their effects on these key factors. Design/methodology/approach: Literature review and semi-structured interviews were used to identify 27 existing HR practices, followed by a quantitative survey of civil engineering professionals from various Indian construction companies. The collected data were analyzed using Partial Least Squares Structural Equation Modelling (PLS-SEM), which provides a comprehensive understanding of the structural relationships and mediation effects of these HR practices on key employee outcomes. Findings: Employee Involvement (EI) is the most effective strategy, significantly enhancing Employee Well-Being (EWB) and positively influencing Employee Retention (ER). Health and Safety (HS) also positively impacted EWB but had an insignificant effect on ER and an adverse, negligible effect on Employee Attraction (EA). Growth Enhancement (GE) positively affected both EWB and ER but showed negligible influence on Employee Productivity (EP) and EA. Originality/value: These findings highlight the need for construction firms to align HR practices with workforce expectations to enhance talent attraction and retention while fostering a supportive and productive work environment. Utilizing PLS-SEM to assess structural relationships and mediation effects, the study provides valuable insights for HR managers to optimize these practices effectively.
- 7 May 2026
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- p. 1-24
Unveiling the impact of current HR strategies on employee attraction, retention, and productivity in the Indian construction industry: emerging challenges
Purpose: In the rapidly evolving Indian construction industry, addressing the shortage of skilled professionals and improving talent attraction, retention, and productivity is crucial for sustaining growth. Targeted research on the impact of current HR practices on employee well-being, attraction, retention, and productivity is essential, and this study aims to identify existing strategies and evaluate their effects on these key factors. Design/methodology/approach: Literature review and semi-structured interviews were used to identify 27 existing HR practices, followed by a quantitative survey of civil engineering professionals from various Indian construction companies. The collected data were analyzed using Partial Least Squares Structural Equation Modelling (PLS-SEM), which provides a comprehensive understanding of the structural relationships and mediation effects of these HR practices on key employee outcomes. Findings: Employee Involvement (EI) is the most effective strategy, significantly enhancing Employee Well-Being (EWB) and positively influencing Employee Retention (ER). Health and Safety (HS) also positively impacted EWB but had an insignificant effect on ER and an adverse, negligible effect on Employee Attraction (EA). Growth Enhancement (GE) positively affected both EWB and ER but showed negligible influence on Employee Productivity (EP) and EA. Originality/value: These findings highlight the need for construction firms to align HR practices with workforce expectations to enhance talent attraction and retention while fostering a supportive and productive work environment. Utilizing PLS-SEM to assess structural relationships and mediation effects, the study provides valuable insights for HR managers to optimize these practices effectively.
- 1 August 2024
- Published by University of Moratuwa
- p. 79-91
Addressing the skilled professional shortage in Indian sustainable construction: a focus on awareness, education, training, and policy interventions
The sustainable construction industry is experiencing rapid growth, propelled by the urgent global need to reduce environmental impact and enhance resilience in the built environment. Nevertheless, this expansion is met with a significant deficit of skilled professionals equipped with the necessary knowledge and expertise in sustainable construction practices. This research explores the multifaceted approach required to rectify this shortage, with a primary focus on enhancing awareness and education, addressing training needs, and implementing effective policy interventions. This study begins with the examination of existing literature related to sustainable construction education, training, and current strategies to identify gaps and challenges. The research methodology entails a literature review to identify factors causing skilled professional shortages in construction. Semi-structured interviews with construction professionals follow this to confirm and explore underlying reasons. Transcripts are then analysed using content analysis to extract main themes and sub-themes. Gaining insight into the root causes of skilled shortages and the challenges within sustainable construction guides the development of targeted strategies aimed at attracting more professionals to the field. Proposed strategies for addressing shortages are validated with construction professionals, and conclusions are drawn. This approach not only helps alleviate professional shortages but also fosters sustainable growth within the sector. The findings of the study offer valuable insights for stakeholders, educational institutions, and policymakers, enabling them to enhance their approaches to sustainability in the construction industry.
- 1 August 2024
- Published by University of Moratuwa
- p. 79-91
Addressing the skilled professional shortage in Indian sustainable construction: a focus on awareness, education, training, and policy interventions
The sustainable construction industry is experiencing rapid growth, propelled by the urgent global need to reduce environmental impact and enhance resilience in the built environment. Nevertheless, this expansion is met with a significant deficit of skilled professionals equipped with the necessary knowledge and expertise in sustainable construction practices. This research explores the multifaceted approach required to rectify this shortage, with a primary focus on enhancing awareness and education, addressing training needs, and implementing effective policy interventions. This study begins with the examination of existing literature related to sustainable construction education, training, and current strategies to identify gaps and challenges. The research methodology entails a literature review to identify factors causing skilled professional shortages in construction. Semi-structured interviews with construction professionals follow this to confirm and explore underlying reasons. Transcripts are then analysed using content analysis to extract main themes and sub-themes. Gaining insight into the root causes of skilled shortages and the challenges within sustainable construction guides the development of targeted strategies aimed at attracting more professionals to the field. Proposed strategies for addressing shortages are validated with construction professionals, and conclusions are drawn. This approach not only helps alleviate professional shortages but also fosters sustainable growth within the sector. The findings of the study offer valuable insights for stakeholders, educational institutions, and policymakers, enabling them to enhance their approaches to sustainability in the construction industry.
- 1 August 2024
- Published by University of Moratuwa
- p. 827-838
‘Plan of action’ for organisational change: a case study of Indian public sector construction organisation
Recently, one of the Indian public sector construction organisations has adopted app-based work measurement and its billing system to reduce the cycle time in the “Procure to Pay” process. Though it could be a small technological change in the working process that has re-engineered the “As-is” processes, it changes the entire organisational dynamics thereby eliminating gaps in the system. Therefore, this paper provides insights into these change management practices in the public sector construction organisation in the context of implementing technological change in the work process. To develop the "Plan of Action," this study utilised a case study methodology. This ‘Plan of Action’ consists of the following strategies change initiative, formation of change management team, leadership support and involvement, research and benchmarking, stakeholder involvement and engagement, change resistance and persuasion, mandatory training integration, operational efficiency analysis and stabilisation phase. It is revealed that the organisation required commendable efforts in conceptualising, planning, and executing the change process along with special attention to enhancing leadership participation, increasing stakeholder engagement, and providing extensive instruction, training and support to all employees and stakeholders.
- 1 August 2024
- Published by University of Moratuwa
- p. 827-838
‘Plan of action’ for organisational change: a case study of Indian public sector construction organisation
Recently, one of the Indian public sector construction organisations has adopted app-based work measurement and its billing system to reduce the cycle time in the “Procure to Pay” process. Though it could be a small technological change in the working process that has re-engineered the “As-is” processes, it changes the entire organisational dynamics thereby eliminating gaps in the system. Therefore, this paper provides insights into these change management practices in the public sector construction organisation in the context of implementing technological change in the work process. To develop the "Plan of Action," this study utilised a case study methodology. This ‘Plan of Action’ consists of the following strategies change initiative, formation of change management team, leadership support and involvement, research and benchmarking, stakeholder involvement and engagement, change resistance and persuasion, mandatory training integration, operational efficiency analysis and stabilisation phase. It is revealed that the organisation required commendable efforts in conceptualising, planning, and executing the change process along with special attention to enhancing leadership participation, increasing stakeholder engagement, and providing extensive instruction, training and support to all employees and stakeholders.
- 12 March 2024
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 25 (4) , 3763-3776
Stakeholder management and its role on value creation in construction projects: A cross-case analysis
- 12 March 2024
- Published by Springer Nature in Asian Journal of Civil Engineering
- Vol. 25 (4) , 3763-3776
Stakeholder management and its role on value creation in construction projects: A cross-case analysis
- Open Access
Development of a Performance Index Model for Evaluation of BIM-Based Stakeholder Management Using Fuzzy Synthetic Evaluation
A continuous evaluation of the stakeholder management process can be achieved using definitive key performance indicators (KPIs). An exhaustive literature survey in this direction provided a set of 26 indicators assessed through a questionnaire survey for their possible implications on the stakeholder management process. The survey was conducted among 55 respondents with experience in using building information modeling (BIM) in mega-construction projects. The data were initially analyzed through factor analysis to establish six KPIs. Fuzzy synthetic evaluation (FSE) was used to evaluate the index values of the established KPIs to assess their importance levels. The results presented the KPIs in decreasing order of their index values: asset performance (4.27), open innovation (4.04), project O&M expenses (3.97), design process efficiency (3.95), project execution efficiency (3.90), and stakeholder concerns (3.59). The results generated a stakeholder management process assessment framework and model that provides a clear insight into using an indicator in measuring the specific stakeholder management dimension. The findings of this work can provide definite insight amongst planning managers about the stakeholder management process through the posited indicators. Further, they can adopt measures to improve the stakeholder management process in their respective projects.
Open AccessDevelopment of a Performance Index Model for Evaluation of BIM-Based Stakeholder Management Using Fuzzy Synthetic Evaluation
A continuous evaluation of the stakeholder management process can be achieved using definitive key performance indicators (KPIs). An exhaustive literature survey in this direction provided a set of 26 indicators assessed through a questionnaire survey for their possible implications on the stakeholder management process. The survey was conducted among 55 respondents with experience in using building information modeling (BIM) in mega-construction projects. The data were initially analyzed through factor analysis to establish six KPIs. Fuzzy synthetic evaluation (FSE) was used to evaluate the index values of the established KPIs to assess their importance levels. The results presented the KPIs in decreasing order of their index values: asset performance (4.27), open innovation (4.04), project O&M expenses (3.97), design process efficiency (3.95), project execution efficiency (3.90), and stakeholder concerns (3.59). The results generated a stakeholder management process assessment framework and model that provides a clear insight into using an indicator in measuring the specific stakeholder management dimension. The findings of this work can provide definite insight amongst planning managers about the stakeholder management process through the posited indicators. Further, they can adopt measures to improve the stakeholder management process in their respective projects.
- 15 December 2021
- Published by Springer Nature
- p. 65-73
Assessing the Effect of Audit Compliance, Conflict Management and Bureaucratic Attitude on the Success of Public Projects
- 15 December 2021
- Published by Springer Nature
- p. 65-73
Assessing the Effect of Audit Compliance, Conflict Management and Bureaucratic Attitude on the Success of Public Projects
- 15 December 2021
- Published by Springer Nature
- p. 153-164
Assessing the Critical Success Factors for PWD Projects in Rural Area
- 15 December 2021
- Published by Springer Nature
- p. 153-164
Assessing the Critical Success Factors for PWD Projects in Rural Area
- 4 September 2021
- Published by Springer Nature
- p. 667-675
Challenges and Benefits of BIM Adoption in a Metrorail Project
- 4 September 2021
- Published by Springer Nature
- p. 667-675
Challenges and Benefits of BIM Adoption in a Metrorail Project
- 1 January 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 146 (1)
Relational Partnership in Public Construction Organizations: Front-Line Employee Perspective
The adoption of relational contracting (RC) has been increasingly used by parties in various developed countries as one of the innovative tools in traditional contracting to achieve benefits such as cost savings, schedule reduction, reduced litigation, improved teamwork, increased trust, stronger relationships, and overall satisfaction. However, the adoption of RC in public-sector construction organizations has been observed to encounter difficulties when compared with implementation in private-sector organizations because of typical barriers, including a lack of understanding of partnering principles and personality indifference, in addition to a low offer mentality, ineffective top management, and a lack of positive working-level commitment. Studies in this area conducted with the objective of ensuring the effective implementation of RC in public-sector organizations are also limited. In view of this, this study aims at exploring the factors that will have an important impact on developing RC practices and the relationship between the contractor and the public firm. Previous studies focused on the identification of the success factors of RC, but those studies were limited to RC implementation from a top management perspective only. Thus, this study investigates the critical factors in RC that are necessary to produce successful relational partnerships in public organizations exclusively from the perspective of front-line employees. The front-line employees include junior engineers and assistant engineers, who are responsible for the day-to-day management of construction activities. An extensive literature review offered 9 important relational contract success factors that were identified and measured by 29 indicators. The data were collected from 202 operational-level employees at four public-sector construction organizations in India. The structural equation modeling technique was used for data analysis. The critical factors identified from the study are training, organizational change, commitment of top management, partner selection, and the assessment process. Organizational change for partnering emerged from this study as one of the new critical factors. The findings from this study could be used to improve the relational partnerships of public organizations.
- 1 January 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 146 (1)
Relational Partnership in Public Construction Organizations: Front-Line Employee Perspective
The adoption of relational contracting (RC) has been increasingly used by parties in various developed countries as one of the innovative tools in traditional contracting to achieve benefits such as cost savings, schedule reduction, reduced litigation, improved teamwork, increased trust, stronger relationships, and overall satisfaction. However, the adoption of RC in public-sector construction organizations has been observed to encounter difficulties when compared with implementation in private-sector organizations because of typical barriers, including a lack of understanding of partnering principles and personality indifference, in addition to a low offer mentality, ineffective top management, and a lack of positive working-level commitment. Studies in this area conducted with the objective of ensuring the effective implementation of RC in public-sector organizations are also limited. In view of this, this study aims at exploring the factors that will have an important impact on developing RC practices and the relationship between the contractor and the public firm. Previous studies focused on the identification of the success factors of RC, but those studies were limited to RC implementation from a top management perspective only. Thus, this study investigates the critical factors in RC that are necessary to produce successful relational partnerships in public organizations exclusively from the perspective of front-line employees. The front-line employees include junior engineers and assistant engineers, who are responsible for the day-to-day management of construction activities. An extensive literature review offered 9 important relational contract success factors that were identified and measured by 29 indicators. The data were collected from 202 operational-level employees at four public-sector construction organizations in India. The structural equation modeling technique was used for data analysis. The critical factors identified from the study are training, organizational change, commitment of top management, partner selection, and the assessment process. Organizational change for partnering emerged from this study as one of the new critical factors. The findings from this study could be used to improve the relational partnerships of public organizations.