A single machine carryover sequence-dependent group scheduling in PCB manufacturing
Authors:
- M.T. Yazdani SabouniMSM.T. Yazdani Sabouni
- Rasaratnam LogendranRLRasaratnam Logendran
- 1 January 2013
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 40 (1) , 236-247
Abstract
No abstract availableKeywords
Funding Information
- National Science Foundation (USA) (CMMI-1029471)
This publication has 14 references indexed in Scilit:
- Group-scheduling problems in electronics manufacturingJournal of Scheduling, 2009
- A memetic algorithm-based heuristic for a scheduling problem in printed circuit board assemblyComputers & Industrial Engineering, 2009
- A Group Setup Strategy for PCB Assembly on a Single Automated Placement Machine2006
- Grouping and sequencing PCB assembly jobs with minimum feeder setupsRobotics and Computer-Integrated Manufacturing, 2006
- Scheduling Jobs on Parallel Machines with Sequence-Dependent Family Set-up TimesThe International Journal of Advanced Manufacturing Technology, 2002
- A new lower bound for the flow shop group scheduling problemComputers & Industrial Engineering, 2001
- Group technology approach to the open shop scheduling problem with batch setup timesOperations Research Letters, 2000
- Replanning and analysis of partial setup strategies in printed circuit board assembly systemsInternational Journal of Flexible Manufacturing Systems, 1996
- AUTOMATED PROCESS PLANNING FOR PRINTED CIRCUIT CARD ASSEMBLYIIE Transactions, 1992
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool SwitchesOperations Research, 1988