Framework for Managing Integration Challenges of Last Planner System in IMPs
- 1 May 2018
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 144 (5)
Abstract
International megaprojects (IMPs) have a poor record of budget and schedule overruns. Lean Construction methods and the associated Last Planner System (LPS) have been successfully implemented in many projects, but the application of the LPS in IMPs is limited due to integration challenges and organizational behavior issues inherent in IMPs. Integration herein refers to the interfaces between subprojects in a megaproject. This paper introduces the IMPact framework to address integration challenges. A modified two-round Delphi method was used to identify, verify, and rate integration challenges. Thirty-one challenges were identified. After the development of the framework, the nominal group technique confirmed its internal validity. Finally, external validation was achieved in a focus group study. The measurement system of the proposed framework was tested on a real IMP. The validated framework provided a conceptual practical solution, based in LPS, to address the challenges within and across subprojects. It is intended to be an adaptive roadmap to address these challenges and potentially improve the performance of IMPs.Keywords
This publication has 30 references indexed in Scilit:
- Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle EastInternational Journal of Construction Education and Research, 2017
- Moving freight on public transit: Best practices, challenges, and opportunitiesInternational Journal of Sustainable Transportation, 2016
- What you Should Know about Megaprojects and Why: An OverviewProject Management Journal, 2014
- Adaptive Capacity Within a Mega Project: A Case Study on Planning and Decision-Making in the Face of ComplexityEuropean Planning Studies, 2014
- Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System UsersJournal of Construction Engineering and Management, 2013
- The case for “3D triangulation” when applied to construction management researchConstruction Innovation, 2010
- Qualitative Research: Application of the Delphi Method to CEM ResearchJournal of Construction Engineering and Management, 2010
- Contributing factors in construction accidentsApplied Ergonomics, 2005
- Lessons Learned in Designing Research Methodology in Field-Based Construction ResearchJournal of Professional Issues in Engineering Education and Practice, 2004
- Discussion of “ Criticism of CPM for Project Planning Analysis ” by Ali Jaafari (June, 1984, Vol. 110, No. 2)Journal of Construction Engineering and Management, 1987