    Preliminary Design and Analysis of a Photovoltaic-Powered Direct Air Capture System for a Residential Building

    by Anwar Hamdan Al Assaf, Odi Fawwaz Alrebei, Laurent M. Le Page, Luai El-Sabek, Bushra Obeidat, Katerina Kaouri, Hamed Abufares, Abdulkarem I. Amhamed

    To promote the adoption of Direct Air Capture (DAC) systems, this paper proposes and tests a photovoltaic-powered DAC system in a generic residential building located in Qatar. The proposed DAC system can efficiently reduce CO2 concentration in a living space, thus providing an incentive to individuals to adopt it. The ventilation performance of the building is determined using Computational Fluid Dynamics (CFD) simulations, undertaken with ANSYS-CFD. The CFD model was validated using microclimate-air quality dataloggers. The simulated velocity was 1.4 m/s and the measured velocity was 1.35 m/s, which corresponds to a 3.5% error. The system decarbonizes air supplied to the building by natural ventilation or ventilation according to the ASHRAE standards. Furthermore, the performance of the photovoltaic system is analyzed using the ENERGYPLUS package of the Design Builder software. We assume that 75% of CO2 is captured. In addition, a preliminary characterization of the overall system’s performance is determined. It is determined that the amount of CO2 captured by the system is 0.112 tones/year per square meter of solar panel area. A solar panel area of 19 m2 is required to decarbonize the building with natural ventilation, and 27 m2 is required in the case of ventilation according to the ASHRAE standard.


  • Framework for Managing Integration Challenges of Last Planner System in IMPs

    by Luai M. El-Sabek, Brenda Y. McCabe

    International megaprojects (IMPs) have a poor record of budget and schedule overruns. Lean Construction methods and the associated Last Planner System (LPS) have been successfully implemented in many projects, but the application of the LPS in IMPs is limited due to integration challenges and organizational behavior issues inherent in IMPs. Integration herein refers to the interfaces between subprojects in a megaproject. This paper introduces the IMPact framework to address integration challenges. A modified two-round Delphi method was used to identify, verify, and rate integration challenges. Thirty-one challenges were identified. After the development of the framework, the nominal group technique confirmed its internal validity. Finally, external validation was achieved in a focus group study. The measurement system of the proposed framework was tested on a real IMP. The validated framework provided a conceptual practical solution, based in LPS, to address the challenges within and across subprojects. It is intended to be an adaptive roadmap to address these challenges and potentially improve the performance of IMPs.


  • Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East

    by Luai M. El-Sabek, Brenda Y. McCabe

    The majority of mega construction projects suffer from delay and budget overrun syndromes. Despite the universal negative image of mega projects, they are essential for the development of public infrastructure. Little is known about how production planning and control of the challenging operational sites of mega-projects is handled. Compounding the complexity with an international context can substantially increase the risk of successful delivery. The purpose of this article is to explore how common production planning and control systems address the coordination challenges of international mega-projects. By understanding the nuances of international projects, a new definition is introduced. Characteristics of mega-projects found in the literature are reviewed and enhanced. Thirty-two experts, with a minimum of 15 years of experience, from 10 international mega-projects were interviewed in a structured interview process to augment the literature review. It was concluded that available production planning and control systems require special treatment to address the coordination challenges of international mega-projects. The interviewed experts reported changes to schedule, budget, scope, as well as an inadequate quality of design are categorized by as the most challenging factors affecting the coordination and delivery of international mega-projects.