The two-machine flow-shop problem with weighted late work criterion and common due date
Authors:
- Jacek BłażewiczJBJacek Błażewicz
- Erwin PeschEPErwin Pesch
- Małgorzata SternaMSMałgorzata Sterna
- Frank WernerFrank Werner
- 1 September 2005
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 165 (2) , 408-415
Abstract
No abstract availableThis publication has 9 references indexed in Scilit:
- Open shop scheduling problems with late work criteriaDiscrete Applied Mathematics, 2004
- Total Late Work Criteria for Shop Scheduling Problems2000
- Scheduling shops to minimize the weighted number of late jobsOperations Research Letters, 1994
- Minimizing Maximum Weighted Error for Imprecise Computation TasksJournal of Algorithms, 1994
- Approximation algorithms for scheduling a single machine to minimize total late workOperations Research Letters, 1992
- Algorithms for Scheduling Imprecise Computations with Timing ConstraintsSIAM Journal on Computing, 1991
- Scheduling imprecise computations to minimize total errorMicroprocessing and Microprogramming, 1989
- Minimizing mean weighted execution time loss on identical and uniform processorsInformation Processing Letters, 1987
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954