First Full-Depth Deck-Panel Accelerated Bridge Construction Project in Michigan: Constructability Challenges and Lessons Learned
- 1 February 2014
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Performance of Constructed Facilities
- Vol. 28 (1) , 128-135
Abstract
No abstract availableThis publication has 4 references indexed in Scilit:
- State of the Art Report on Full Depth Precast Concrete Bridge Deck Panels2011
- Quantifying Time and User Cost Savings for Rapid Bridge Construction TechniqueTransportation Research Record: Journal of the Transportation Research Board, 2010
- All-Precast Substructure Accelerates Construction of Prestressed Concrete Bridge in New HampshirePCI Journal, 2005
- STABILITY DESIGN OF LONG PRECAST CONCRETE BEAMS.Proceedings of the Institution of Civil Engineers - Structures and Buildings, 1999