  • Monitoring During the Unbraced Network Tied-Arch Bridge Construction Using ABC Techniques

    by Harsha Amunugama, Upul Attanayake, Mike LaViolette, Bradley M. Wagner, Matt Longfield, Purushotham Pakala, John A. Belcher

    A unique network tied-arch bridge with free-standing arches was designed to carry the 2 nd Avenue traffic over the Interstate (I) 94 in Detroit, Michigan. This 245-ft-long, 96.5-ft-wide, and 18° skew bridge is the first skewed unbraced network arch bridge in the United States. The skeleton of the superstructure was erected off-site at a bridge staging area and moved and placed over the I-94 freeway using self-propelled modular transporters to complete construction. Based on the observations from the analysis models and the communications with the Michigan Department of Transportation, the Engineer of Records, and the peer review engineer, an instrumentation system was designed and installed in the bridge to: (i) monitor and record strains in major components during construction to determine the state of stress after construction; (ii) monitor and record the change in strains during service life to support bridge maintenance and load rating decisions; and (iii) collect adequate data to verify design assumptions. This paper discusses instrumentation system planning, design, and implementation, including sensor locations, data acquisition systems, cable and power management, data collection, and observations. The instrumentation system functions as expected. The monitoring data confirm that the structural component strains are within the design limits and the structure functions as expected.

  • Detection of Concrete Surface Crack Depth Using Ultrasonic Pulse Velocity (UPV) Methods

    by B. M. K. L. K. Basnayake, A. R. M. H. B. Amunugama, U. B. Attanayake


  • Performance of Two Thin Epoxy Overlays on New Concrete under Laboratory and Outdoor Exposure Conditions

    by Abul Fazal Mazumder, Upul Attanayake, Neal S. Berke

    Thin epoxy overlays are used for improving the condition and extending the service life of bridge decks. The tensile bond pull-off strength, evaluated as per ASTM C1583, is used as the performance indicator. A failure in the substrate with a tensile strength of 250 pounds per square inch (psi) or greater is considered acceptable. However, the performance of in-service bridge decks when evaluated shows inconsistent results. Such studies failed to record and correlate the parameters that influence overlay performance during testing to clarify the observed variations. Laboratory studies by several researchers have documented a distinct performance difference when the overlays are exposed to room temperatures in comparison with elevated temperatures. However, the most influential parameters, such as the variation of substrate moisture against temperature and epoxy softening under elevated temperatures, were not measured and correlated to the observed performance. This study was initiated to provide clarification of the observed performance differences by evaluating the impact of concrete age at the time of epoxy application, concrete mix ingredients, exposure conditions, concrete microstructure development, and substrate moisture and temperature on the performance of two epoxy overlays. Experimental results confirm that (i) the performance of epoxy overlays improves when the concrete mix contains slag and (ii) substrate moisture vapor pressure and epoxy softening under elevated temperature negatively affect the overlay performance.


  • Noncontact Measurement of Bridge Load Response Using He–Ne Modulated Lasers

    by Upul Attanayake, Haluk Aktan

    Structural deformation under known loads is required for assessment and model calibration. In addition, deformations need to be measured under transient as well as intrinsic loads. These loads have significantly different application durations requiring significantly different sampling rates. Measurement of deformations and translations with traditional sensors is challenging because it requires sensor mounting to a fixed reference. In the case of monitoring structures during construction, limited access and schedule constraints necessitate placement of the monitoring equipment outside the active construction zone. This article presents an implementation as well as proof of concept of a noncontact technology for obtaining accurate measurements with minimum impact to the structure and construction activities. Indoor and outdoor calibration showed that the deviation of measurements made at an 81-m (266-ft) range was about ±7% of the linear displacement potentiometer sensors. The maximum deviation of deflection measurements made during load testing of a steel girder bridge was 8.3% of the linear displacement potentiometer sensors. The measurements included three-dimensional (3D) displacements at each location, a significant advancement over traditional technologies.


  • Procedures and Guidelines for Design of Lateral Bridge Slide Activities

    by Upul Attanayake, Haluk Aktan

    Accelerated bridge construction (ABC) methods are implemented to reduce mobility impact time. In Michigan, four bridges were replaced using lateral slide, which is one of the ABC methods. The Michigan projects, a large volume of project documentation in the Federal Highway Administration (FHWA) repository, and resources available through state departments of transportation (DOTs) were reviewed and the successes, difficulties, and activities were documented and analyzed. Additionally, instrumentation and monitoring as well as simulations of two slides completed in Michigan were performed. Simulations evaluated structural system response, and investigated the sources and effects of the complications during slides. Based on the experience through all these activities, a detailed step-by-step design procedure is developed and described in this article. The purpose of the article is to provide a structured process to complete, review, and verify the design calculations related to slide activities described in the current AASHTO guidelines. The procedures described in this article, along with the AASHTO specifications, can be used to design and execute repeatable slide implementations.


  • Monitoring Substructure Movements during Slide-In Bridge Construction

    by Abdul Wahed Mohammed, Upul Attanayake, Haluk Aktan

    To reduce disruption to traffic during bridge replacement, accelerated bridge replacement (ABR) methodologies are being developed. One of the ABR methodologies being implemented is slide-in bridge construction (SIBC), which reduces the total duration of traffic disruption to less than one or two weekends. Because the SIBC activities are new, the system response is unknown. Quantification of the loads acting on permanent and temporary structures during the slide operation is required to develop recommendations for standardizing SIBC. With this purpose, substructure movements were monitored during an SIBC project in Michigan, USA, and the forces acting on the substructure during the slide operation were back-calculated. Theoretically, forces develop in the sliding direction because of friction, and in the vertical direction because of superstructure weight. However, the analysis results indicated that a force couple developed due differential friction at the sliding surfaces, and resulted in rotatin...


  • Open Access

    Economic Impact on Surrounding Businesses due to Bridge Construction

    by Funda Yavuz, Upul Attanayake, Haluk Aktan


  • Monitoring During Lateral Bridge Slide

    by Ozan Ridvanoglu, Upul Attanayake, Haluk Aktan

    Slide-in bridge construction (SIBC) is an accelerated bridge construction method. In U.S. state of the art and state of the practice today, the bridge superstructure is moved by sliding laterally into the final alignment following a sequence of construction and demolition events. SIBC implementation components require a temporary support structure, a slide system with railing girders and polytetrafluoroethylene pads or rollers, and an actuating system to initiate and maintain the slide movement. The M-100 bridge over the Canadian National (CN) railway was the third SIBC project implemented by the Michigan Department of Transportation. Each SIBC implementation has been so far unique because the unknowns include slide properties contributing to friction between surfaces, pushing and pulling force levels, and monitoring and controlling the force levels. The purpose of standardization is to develop repeatable procedures for the SIBC method. One aspect of standardization is to develop an understanding of the structural response and the forces developed in the system during slide activities. This understanding requires documentation of various SIBC practices, simulation of slide activities, and monitoring the structural response. The activities of the M-100 road over the CN railway bridge slide, instrumentation and monitoring of the structural response, and the use of acquired acceleration data to calculate the forces that developed during the slide activities are presented.