Collaborative optimization of workshop layout and scheduling
- 17 November 2022
- journal article
- research article
- Published by Springer Nature in Journal of Scheduling
- Vol. 26 (1) , 43-59
Abstract
No abstract availableKeywords
Funding Information
- Natural Science Foundation of Zhejiang Province of China (LY16G010013)
- National High-tech R&D Program of China (2015AA043002)
This publication has 56 references indexed in Scilit:
- Solving facility layout problems using Flexible Bay Structure representation and Ant System algorithmExpert Systems with Applications, 2010
- Genetic algorithms for integrating cell formation with machine layout and schedulingComputers & Industrial Engineering, 2007
- Scheduling and lot sizing with sequence-dependent setup: A literature reviewIIE Transactions, 2006
- Combining evolutionary computation and dynamic programming for solving a dynamic facility layout problemEuropean Journal of Operational Research, 2005
- Simulation of supply chain behaviour and performance in an uncertain environmentInternational Journal of Production Economics, 2001
- An effective genetic algorithm for job shop schedulingProceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 2000
- A branch-and-bound algorithm for the hybrid flowshopInternational Journal of Production Economics, 2000
- Project scheduling algorithms for re-layout projectsIIE Transactions, 1998
- Cellular automata as models of complexityNature, 1984
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954