Progress on TF and PF Conductor for ITER in China
Authors:
- 28 October 2013
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 24 (3) , 1-4
Abstract
China International Nuclear Fusion Energy Program Execution Center (ITER China), the China Domestic Agency for ITER, is in charge of about 7.51% of the Toroidal Field (TF) conductors, 65.15% of the Poloidal Field (PF) conductors, namely 11 TF conductors and 60 PF conductors. All those conductors are supplied in-kind by ITER China. Following success in qualification test on full-scale short conductor samples, ITER China is stepping into the series production of the TF and PF super conductors. Several tons of Nb3Sn and NbTi strands were manufactured, tested, and delivered from strands supplier to assembling supplier under the supervision of the ITER China and all the conductor manufacture processes complied with ITER quality assurance requirements. This article reports the progress on TF and PF conductor of ITER China up to December 2012.Keywords
Funding Information
- International Nuclear Fusion Energy Program Execution Center (ITER China)
- Institute of Plasma Physics, CAS
- Western Superconducting Technologies Company Ltd.
This publication has 5 references indexed in Scilit:
- Status of ITER Conductor Development and ProductionIEEE Transactions on Applied Superconductivity, 2012
- The ITER Magnets: Design and Construction StatusIEEE Transactions on Applied Superconductivity, 2011
- Overview of ITER magnet system and European contribution2011
- Review of the Results of the ITER Toroidal Field Conductor R&D and QualificationIEEE Transactions on Applied Superconductivity, 2008
- The ITER Magnet SystemIEEE Transactions on Applied Superconductivity, 2008