The Practice of Forward Prospecting of Adverse Geology Applied to Hard Rock TBM Tunnel Construction: The Case of the Songhua River Water Conveyance Project in the Middle of Jilin Province
Authors:
- Shucai LiSLShucai Li
- Lichao NieLNLichao Nie
- Bin LiuBLBin Liu
Open Access
- 1 February 2018
- journal article
- research article
- Published by Elsevier in Engineering
- Vol. 4 (1) , 131-137
Abstract
No abstract availableKeywords
Funding Information
- National Program on Key Basic Research Project of China (2014CB046901, 2015CB058101)
- National Key Scientific Instrument and Equipment Development Project of China (51327802)
- National Natural Science Foundation of China (51739007, 51479104, 41502279)
- National Key Research and Development Plan (2016YFC0401805, 2016YFC0801604, 2016YFC0401801)
- Key Technology Research and Development Program of Shandong Province (2016ZDJS02A01, 2016GSF120001)
- Science and Technology Major Project of Henan province (161100211100)
This publication has 7 references indexed in Scilit:
- Three-Dimensional Seismic Ahead-Prospecting Method and Application in TBM TunnelingJournal of Geotechnical and Geoenvironmental Engineering, 2017
- An overview of ahead geological prospecting in tunnelingTunnelling and Underground Space Technology, 2017
- Reducing risk in long deep tunnels by using TBM and drill-and-blast methods in the same project–the hybrid solutionJournal of Rock Mechanics and Geotechnical Engineering, 2012
- Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance projectTunnelling and Underground Space Technology, 2009
- BEAM – Geoelectrical Ahead Monitoring for TBM‐DrivesGeomechanics and Tunnelling, 2008
- Engineering and environmental problems in karst — An introductionEngineering Geology, 2008
- Seismic-while-drilling by using tunnel boring machine noiseGeophysics, 2002