Abstract
In this paper, thermal reserve forecasting tool is developed, which evaluates short-termthermalreserve across each overhead line in the test network. The developed tool considers weatherand generator active power dispatching factors towards line’s enhanced thermal reserves.After N-1 line contingency, the minimum thermal reserve time across each line is calculatedbefore and after three generator re-dispatch scenarios, i.e., nominal generator dispatch, thermalreserve time dependent generator dispatch and the economic generator re-dispatch scenariosunder actual and worst weather conditions. The actual weather conditions under the proposedthermal reserve dependent generator re-dispatch resulted significant improvement in thermalreserve time in comparison to nominal and economic generator re-dispatching regardless ofambient conditions. The enhanced thermal reserve time is found to facilitate the systemoperator towards timely selection of appropriate curative control measures to relieve thecongestion from the network.

This publication has 20 references indexed in Scilit: