Effective ready mixed concrete supply adjustments with inoperative mixers under stochastic travel times
Authors:
- 22 January 2016
- journal article
- research article
- Published by Taylor & Francis in Transportation Letters
- Vol. 8 (5) , 286-300
Abstract
The purpose of this study is to develop a systematic scheduling model that will help ready mixed concrete (RMC) carriers/suppliers with effective scheduling adjustment after temporary breakdown of mixers under stochastic travel times. The model is formulated as a mixed integer network flow problem with side constraints that is characterized as NP-hard. The authors employ problem decomposition and relaxation techniques, with a mathematical programing solver, to develop an algorithm that is capable of efficiently solving the problem. A simulation-based evaluation method is also proposed to evaluate the model, joined with a deterministic model, as well as the method currently used in actual operations. Finally, a case study is performed using real operating data from a Taiwan RMC firm. The preliminary results demonstrate that the stochastic model and the solution algorithm could be useful to reduce system cost for the RMC carrier in actual operations.Keywords
Funding Information
- National Science Council (NSC-101-2221-E-008-098-MY2, NSC-98-2221-E-008-077-MY3)
This publication has 21 references indexed in Scilit:
- Interpolation solution in generalized stochastic exponential population growth modelApplied Mathematical Modelling, 2012
- Dispatching ready mixed concrete trucks under demand postponement and weight limit regulationAutomation in Construction, 2010
- Short-term manpower planning for MRT carriage maintenance under mixed deterministic and stochastic demandsAnnals of Operations Research, 2010
- Analysis, modeling and solution of the concrete delivery problemEuropean Journal of Operational Research, 2009
- OR PRACTICE—The Dance of the Thirty-Ton Trucks: Dispatching and Scheduling in a Dynamic EnvironmentOperations Research, 2008
- Solving a Time-Space Network Formulation for the Convoy Movement ProblemOperations Research, 2005
- Optimizing the schedule of dispatching RMC trucks through genetic algorithmsAutomation in Construction, 2004
- HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong KongJournal of Construction Engineering and Management, 2003
- An effective simulation mechanism for construction operationsAutomation in Construction, 2003
- Stochastic Vehicle Routing with Random Travel TimesTransportation Science, 2003