Construction-Monitoring Analysis of a Symmetrical Rigid Frame Tied Steel Box Arch Bridge in Southwest China Based on Segmental Assembly Technique
Open Access
Abstract
Tied steel box arch bridges are increasingly being used due to their attractive appearance, high load-bearing capacity, and good stress performance. Their construction involves multiple processes and factors. Construction monitoring can ensure that such a bridge remains in its intended stress and linear states during and after construction. This helps to minimize deviations from the design state at every stage of construction. Using the segmental assembly construction technique, this study conducted construction monitoring of the alignment and force at each stage of the reconstruction of bridges using MIDAS Civil software. The construction monitoring analysis indicated that the arch rib and lattice beam were correctly placed, thereby meeting the specified requirements for arch rib closure. Displacement errors between the measured and theoretical values at each stage of construction fell within an allowable range, resulting in overall smooth bridge alignment. The measured stress in the main arch and the lattice beam generally corresponded to the theoretical stress derived from the control section stress of the entire bridge. The deviation between the cable force of the suspender and the tie rod and theoretical value fell within 10%, indicating good stress reserve. The symmetrical monitoring points in the analyzed rigid-frame tied steel box arch bridges exhibited symmetrical displacement, stress, and cable force results under various working conditions. This observation further confirms the effectiveness of construction monitoring using the segmental assembly technique.Keywords
Funding Information
- National Key Research and Development Program of China (2021YFB2600604, AB22035074, JJKH20221019KJ)
- Science and Technology Key R&D Project of Guangxi (2021YFB2600604, AB22035074, JJKH20221019KJ)
- Scientific Research Project of the Department of Education of Jilin Province (2021YFB2600604, AB22035074, JJKH20221019KJ)
- Postdoctoral Researcher Selection Funding Project of Jilin Province (2021YFB2600604, AB22035074, JJKH20221019KJ)
This publication has 34 references indexed in Scilit:
- Study on the safety of the concrete pouring process for the main truss arch structure in a long-span concrete-filled steel tube arch bridgeMechanics of Advanced Materials and Structures, 2019
- Local Stress Behavior of Post-Tensioned Prestressed Anchorage Zones in Continuous Rigid Frame Arch Railway BridgeApplied Sciences, 2018
- Field Test of a Large-Span Soil–Steel Bridge Stiffened by Concrete Rings during BackfillingJournal of Bridge Engineering, 2017
- FBG force-testing ring for bridge cable force monitoring and temperature compensationSensors and Actuators A: Physical, 2015
- Buckling design of steel tied-arch bridgesJournal of Constructional Steel Research, 2014
- A novel deployable tied arch bridgeEngineering Structures, 2014
- Field Test and Three-Dimensional Numerical Analysis of Soil–Steel Tunnel during BackfillingTransportation Research Record: Journal of the Transportation Research Board, 2014
- Seismic assessment of a long-span arch bridge considering the variation in axial forces induced by earthquakesEngineering Structures, 2012
- Concrete-Filled Steel Tubular Tied Arch Bridge System: Application to Columbus ViaductJournal of Bridge Engineering, 2012
- Field Load Tests and Numerical Analysis of Qingzhou Cable-Stayed BridgeJournal of Bridge Engineering, 2007