    Construction-Monitoring Analysis of a Symmetrical Rigid Frame Tied Steel Box Arch Bridge in Southwest China Based on Segmental Assembly Technique

    by Yuanchong Zhang, Longlin Wang, Yu Nong, Wensheng Wang

    Tied steel box arch bridges are increasingly being used due to their attractive appearance, high load-bearing capacity, and good stress performance. Their construction involves multiple processes and factors. Construction monitoring can ensure that such a bridge remains in its intended stress and linear states during and after construction. This helps to minimize deviations from the design state at every stage of construction. Using the segmental assembly construction technique, this study conducted construction monitoring of the alignment and force at each stage of the reconstruction of bridges using MIDAS Civil software. The construction monitoring analysis indicated that the arch rib and lattice beam were correctly placed, thereby meeting the specified requirements for arch rib closure. Displacement errors between the measured and theoretical values at each stage of construction fell within an allowable range, resulting in overall smooth bridge alignment. The measured stress in the main arch and the lattice beam generally corresponded to the theoretical stress derived from the control section stress of the entire bridge. The deviation between the cable force of the suspender and the tie rod and theoretical value fell within 10%, indicating good stress reserve. The symmetrical monitoring points in the analyzed rigid-frame tied steel box arch bridges exhibited symmetrical displacement, stress, and cable force results under various working conditions. This observation further confirms the effectiveness of construction monitoring using the segmental assembly technique.


  • Open Access

    Fatigue Durability Analysis for Suspenders of Arch Bridge Subjected to Moving Vehicles in Southwest China

    by Zimo Zhang, Hua Wang, Tao Yang, Longlin Wang, Xirui Wang

    An analysis of the effect of vehicle loads on the fatigue life of local arch bridge suspenders in Southwest China was conducted by generating vehicle statistics, creating a fatigue vehicle model, and developing a fatigue life prediction method: First, the Midas model of an arch bridge was established, a random vehicle flow simulation was conducted in the Monte Carlo method, and the stress spectrum of the suspenders was calculated. Secondly, ANSYS software was used to estimate the fatigue life of the suspenders, and the accuracy of the proposed method was verified. Finally, the method was applied to the practical project of the Dafeng River Bridge in Southwest China. The results show that this method can predict the fatigue life of suspenders. It can be applied in the bridge health monitoring software system to realize real-time fatigue damage monitoring of the fatigue damage of suspenders, which could be used to predict the fatigue lives of bridges in Southwest China and provide references for the replacement of suspenders.


  • Open Access

    On-Site Full-Scale Load Test and Reliability Evaluation of Prefabricated Bridge Substructure for “Pile–Column Integration”

    by Hua Wang, Longlin Wang, Kailv Yang, Shuzhi Xie, Gangrong Wei, Ruijiao Li, Wensheng Wang

    The application of prefabricated bridge structures is of great significance to building industrialization, which can realize the green construction and maintenance process of low energy consumption and low emission as well as the normal operation of transportation in time, and effectively realize the green development requirements. However, the substructure of a conventional prefabricated bridge usually needs to cast a bearing platform between pier and column, and may not give full play to the advantages of prefabricated bridge construction. Given the engineering characteristics that most of the pile foundations in the bridge design of this engineering project are end-bearing piles, in which the pile foundation is not deep and the pile column is not high, the assembly process of “pile–column integration” has been proposed in this study. Aiming at the reconstruction and expansion project of the Qinzhou–Beihai section in the Lanzhou–Haikou expressway, the test site with representative geological conditions was firstly selected. The pile–column structure of the bridge can be completed by prefabricated pile foundation, pier, and cap beam based on the integral assembly installation method. The vertical compressive static load test, horizontal static load test, and reliability test of pile–column connection were introduced in detail to analyze whether the bearing capacity and connection effect of pile–column can meet the requirements. Test results showed that the limit value and corresponding characteristic value of the vertical compressive bearing capacity and horizontal critical load of a single pile could meet the design requirements. The displacement curve of single pile No. 5 at the flange connection position under various loads of the test pile does not have an obvious angle break, and there is no sudden change in the slope, indicating that the flange connection quality is good. Due to many interference factors and some abnormal strain measurement data, the strain data are suggested as auxiliary to the displacement results. The findings of static load testing and connection reliability in this study proved the feasibility of this prefabricated bridge substructure “pile–column integration”, which can provide a reference for the rapid construction of bridges.


  • Open Access

    Full-Scale Prefabrication and Non-Destructive Quality Monitoring of Novel Bridge Substructure for “Pile-Column Integration”

    by Longlin Wang, Hua Wang, Kailv Yang, Shuzhi Xie, Gangrong Wei, Ruijiao Li, Wensheng Wang

    The assembly process of “pile-column integration” is proposed in this study and applied in the engineering with the characteristics that most of the pile foundations are end-bearing piles, which is conducive to returning to the normal operation of transportation infrastructure in a timely manner. From the perspective of practical application, the bridge structure components, including pile column and cap beam, are reasonably designed and prefabricated according to the requirements of the reconstruction and expansion project of the old bridge. Through non-destructive testing technologies, the concrete strength, cover thickness of reinforcement, and component size of prefabricated components are monitored and tested to evaluate the quality of full-scale prefabricated bridge substructure for “pile-column integration”. The monitoring results showed that the concrete strength monitoring results of prefabricated components by the rebound method are relatively stable. The concrete strength of the prefabricated components was higher than the design concrete strength and their qualified rate was 100%. According to the monitoring of cover thickness of reinforcement, the measured cover thickness of reinforcement in prefabricated components by electromagnetic induction method fell within the allowable range, and their qualified rates were around 90%. The concrete strength and cover thickness of reinforcement for prefabricated components could meet the design requirements. Although the component size of the prefabricated components could be tested by a 3-D point cloud scanning system, the monitoring effect of a relatively smaller component size still needs to be improved. The quality monitoring of full-scale bridge substructures for “pile-column integration” proved the rationality of prefabrication and the feasibility of non-destructive testing technologies, providing references for the application of “pile-column integration”.


  • Open Access

    Experimental Investigation of the High-Temperature Rheological and Aging Resistance Properties of Activated Crumb Rubber Powder/SBS Composite-Modified Asphalt

    by Zhizhong Zhao, Longlin Wang, Wensheng Wang, Xuanhao Shangguan

    Crumb rubber could form the active groups on the surface by interrupting the crosslinking bond to improve the compatibility with asphalt. While styrene-butadiene-styrene block copolymer (SBS)-modified asphalt has excellent comprehensive properties, it has poor anti-aging performance and a high cost. To explore the influence of composite modification of activated crumb rubber powder (ACR) and SBS on asphalt, modified asphalt samples with different modifiers and SBS contents were prepared. Conventional physical properties tests, a dynamic shear rheometer (DSR), and the thin-film oven test (TFOT) were used to study the conventional physical properties, high-temperature rheological properties, and aging resistance of asphalt. In addition, the action forms and distribution of modifiers in asphalt were observed by an optical microscope to characterize the micro-morphology of ACR/SBS composite-modified asphalt. Test results showed that after adding SBS, the softening point, ductility, and elastic recovery of ACR/SBS asphalt could be significantly improved, but the viscosity and softening point difference were also larger. At the same time, according to the complex shear modulus, phase angle, and rutting factor, SBS can effectively improve the high-temperature deformation resistance of ACR/SBS asphalt. The modified asphalt (ACR/SBS-2) had good high- and low- temperature performances, as well as an appropriate viscosity and low softening point difference, as a research object of aging. After short-term aging, the changes in the high- and low-temperature performances and workability of ACR/SBS asphalt were reduced. Taking the softening point as the target performance, the softening point of ACR/SBS asphalt was less affected by aging time and temperature, indicating that ACR/SBS asphalt was not sensitive to aging temperature and had good stability and aging resistance. From the micrograph by microscope, it was found that ACR/SBS asphalt could maintain a relatively stable polyphase structure for aging resistance.


  • Open Access

    Preliminary Feasibility Investigation on Reutilization of Recycled Crushed Clay Bricks from Construction and Demolition Waste for Cement-Stabilized Macadam

    by Dongxing Wu, Wenchao Chu, Longlin Wang, Wensheng Wang, Haoyun Wang, Xuanhao Shangguan, Xiang Cui

    Utilizing recycled crushed clay brick (RCB) from C&D waste in road engineering construction as the substitute for natural aggregates has attracted a lot of attention, which would be a promising step forward towards sustainable development and green construction. The objective of this study is to assess the feasibility of cement-stabilized macadam (CSM), incorporating various RCB fine aggregate substitution ratios. For this purpose, the physical and chemical properties of RCB fine aggregate was tested, and RCB exhibited a porous surface micro-morphology, high water absorption and pozzolanic activity. Subsequently, a comprehensive experimental investigation of modified CSM with RCB has been carried out based on laboratory tests concerning the mechanical and shrinkage properties. Results showed that higher RCB fine aggregate substitution ratio resulted in lower unconfined compressive strength, and the negative influence of RCB on unconfined compressive strength would decrease gradually, varying curing time; however, the higher the RCB substitution ratio was, the larger the indirect tensile strength at 90 d curing time of the late curing period was. CSM containing RCB had an overall increasing accumulative water loss rate, accumulative strain of dry shrinkage and average coefficient of dry shrinkage, except that 20% RCB resulted in an excellent dry shrinkage property. Moreover, RCB with pozzolanic activity reacted very slowly mainly at later ages, enhancing the interfacial transition zone.


  • Open Access

    Performance Evaluation of a Long-Span Cable-Stayed Bridge Using Non-Destructive Field Loading Tests

    by Xirui Wang, Longlin Wang, Hua Wang, Yihao Ning, Kainan Huang, Wensheng Wang

    As an important part of the transportation network, the reliability of bridge structures is of great significance to people’s personal safety, as well as to the national economy. In order to evaluate the performance of complex bridge structures, their mechanical behavior and fundamental characteristics need to be studied. Structural health monitoring (SHM) has been introduced into bridge engineering, and the structural response assessment, load effects monitoring, and reliability evaluation have been developed based on the collected SHM information. In this study, a performance evaluation method for complex bridge structures based on non-destructive field loading tests is proposed. The cable-stayed bridge in Guangxi with the largest span (Pingnan Xiangsizhou Bridge) was selected as the research object, and loading on the main girder was transferred to the piers and tower through the stay cables, whose structural responses are critical in the process of bridge operation. Therefore, the field loading tests—including deflection and strain testing of the main girder, as well as cable force tests—were also conducted for Pingnan Xiangsizhou Bridge by using non-destructive measurement techniques (multifunctional static strain test system, radar interferometric deformation measurement technology, etc.). Based on the numerically simulated results of a finite element model for Pingnan Xiangsizhou Bridge, reasonable field loading test conditions and loading arrangement were determined. Non-destructive field loading test results showed that the quality of the bridge’s construction is up to standard, due to a good agreement between the calculated and measured frequencies of the bridge. In addition, the calibration coefficients of displacement and strain were less than 1, indicating that Pingnan Xiangsizhou Bridge has satisfactory stiffness and strength.


  • Open Access

    Study on the Precise Displacement Controlling Method for a Suspended Deck in the Hanger Replacement Process of an Arch Bridge

    by Hua Wang, Longlin Wang, Xiaoli Zhuo, Kainan Huang, Xirui Wang, Wensheng Wang

    The hanger often needs to be replaced many times during the operation period of hanger arch bridges. To ensure the safety of the hanger replacement in the construction process of pocket hanging, the structural response in the whole construction process needs to be precisely controlled. In this paper, aiming at half-through arches with a suspended deck by cable hangers, the precise displacement controlling method for hanger replacement of an arch bridge based on the pocket hanging method has been proposed. Firstly, the equivalent model of an arch bridge in the hanger replacement process is established, and the boundary conditions of the equivalent model are calculated precisely. Secondly, in the hanger replacement process, including old hanger demolition and new hanger installation, the precise displacement expressions of the suspended deck are derived on the basis of the equivalent model. Finally, the correctness and feasibility of the proposed precise displacement controlling method are verified by the hanger replacement engineering of an arch bridge. Through this research on the hanger replacement of an arch bridge, the equivalent model adopted in this paper has been proven accurate, and only partial boundary conditions need to be considered in practical engineering applications to get accurate results. Meanwhile, the calculation results are accurate enough through the practical engineering verification, and the precise displacement controlling method is feasible in the hanger replacement process of an arch bridge based on the pocket hanging method. It is also found that satisfactory results can be achieved using hanger demolition and installation by equal step length.


  • Open Access

    Reliability Evaluation of Hinged Slab Bridge Considering Hinge Joints Damage and Member Failure Credibility

    by Guojin Tan, Qingwen Kong, Longlin Wang, Xirui Wang, Hanbing Liu

    The hinged slab bridge is widely used in medium- and small-span bridges because of its simple structure and convenient construction. However, hinge joints damage is the main defect of this kind of bridge, and it is difficult to express the deterministic damage degree of hinge joints in the detection process. A system reliability evaluation method considering fuzzy detection information of hinge joints damage and member failure credibility is proposed in this paper. Firstly, the membership function is used to quantitatively express the fuzzy detection information of hinge joints, and the fuzzy variable is transformed to an equivalent random variable. Secondly, the functional relationship between the transverse distribution coefficient and hinge joints damage is constructed by the modified hinge-jointed plate method and response surface method, and the reliability of the member considering the fuzzy detection information of hinge joints damage is calculated by the first-order second-moment method (FOSM). Then, the failure credibility is introduced to represent the different possibilities of system failure caused by member failure, and a system reliability assessment method of different failure criteria considering member failure credibility is established based on copula theory. Finally, the applicability of the proposed method is verified by taking the reinforced concrete hinged slab bridge as a numerical example.