Abstract
During a shield TBM excavation in hard rock, the immediate backfill of the crown immediately behind the shield is technically difficult to realize. With the advance of the cutter head a relocation process of pea gravel within the annular gap is triggered, leading to an insufficient bedding distribution of the first segments behind the shield tail and to an ovalization of the segmental lining at a certain load level. During a test application as part of an ”TBM research initiative“ of the Austrian Federal Railways geotextile tubes were integrated into the exterior surface of the segments. Immediately after leaving the shield tail, the geotextile tube, which is placed all around one ring of segments, is expanded by injection with grout. As a result, an immediate bedding between the rock mass and segmental lining is established, also preventing the rearrangement of pea gravel within the annular gap when the shield is moved forward. The displacement measurements have shown that the ring of segments equipped with geotextile tubes experiences a more rigid body motion like behaviour after leaving the shield tail with a minimal ovalization only. Numerical simulations show the influence of bedding improvement on the ovalization of the ring of segments after leaving the shield tail.Keywords
This publication has 7 references indexed in Scilit:
- Detection of voids in the annular gap using ground penetrating radar and determination of the in‐situ deformation properties of pea gravelGeomechanics and Tunnelling, 2018
- Backfill of segmental lining – State of the art, redistribution behaviour of pea gravel, possible improvements / Tübbingbettung – Stand der Technik, Umlagerungsverhalten von Perlkies, VerbesserungspotenzialGeomechanics and Tunnelling, 2016
- TBM research in Austria / TVM‐Forschung in ÖsterreichGeomechanics and Tunnelling, 2016
- Tunnelkette Perschling – Reiserbergtunnel and Stierschweiffeldtunnel: TBM Success under Difficult Ground ConditionsGeomechanics and Tunnelling, 2008
- TBM Wienerwald Tunnel - Steps towards Successful TunnellingGeomechanics and Tunnelling, 2008
- Montage von Stahlbetontübbings bei Tunnelbauten mit Schildvortrieb.Beton- und Stahlbetonbau, 1975
- The circular tunnel in elastic groundGéotechnique, 1975