  • Long‐term monitoring of railway tunnels

    by Bernd Moritz, Roman Heissenberger, Tobias Schachinger, Werner Lienhart

    At the large infrastructure projects of the Austrian Federal Railways in the Alpine region geotechnical structures with different characteristics are encountered. Especially heterogeneity and composition of fault zones associated with different stress conditions are a great challenge during tunnelling. Although the system behaviour resulting from ground‐support interaction is measured by monitoring methods, after completion of tunnel works with installation of the inner lining usually the tunnel is no further monitored. The goal of ÖBB‐Infrastructure AG is to apply robust, reliable and durable monitoring systems for the observation of geotechnical relevant structures during a service life of the tunnels of 150 years. Thereby unfavourable tendencies of system behaviour shall be detected early and measures in terms of predictive maintenance planned in due time to ensure high availability of the tunnels during operation. The paper presents the implementation of long‐term monitoring at the projects Koralm Tunnel and Granitztal Tunnel and gives an outlook at the Semmering Base Tunnel.


  • Passing a major fault zone three times: NATM helps TBM to succeed

    by Thomas Pilgerstorfer, Harald Hölzl, Bernd Moritz

    This paper discusses the design and construction of a fault zone of the OeBB Koralmtunnel lot KAT3. Due to the experience gained during the advance of the parallel‐situated southbound tunnel and the aim to minimize the geotechnical hazard for the subsequent excavation of the northbound TBM bore, an extensive redesign regarding the excavation‐concept and ‐method was performed. Five different alternative solutions have been subject to a risk analysis to optimize the required measures and to minimize the cost‐effective risks and hazards to an acceptable level. The set of measures, which was evaluated and juxtaposed, contained solutions for strengthening the rock mass with grouting from the TBM and from aside the bore, conventional tunnelling and backfill with a top heading or full‐face excavation. Finally, the fault zone has been excavated with a conventional top heading drive from a nearby‐situated cross‐passage. Subsequently this tunnel stretch has been excavated by TBM without any construction delay. The paper focuses on highlighting the importance of a consequent application of the observational method and thereof derived measures in the context of a geotechnical safety management plan for controlling the residual risks.


  • 150 years reliable railway tunnels – Extending the hybrid method for the long‐term safety assessment

    by Christian Hellmich, Bernhard Pichler, Roman Heissenberger, Bernd Moritz

    Quantification of the level of loading of shotcrete supports from measured displacements of NATM‐driven tunnels is common practice in Austria. At construction sites of the Austrian Federal Railways (OeBB), a hybrid method developed at the TU Wien (Vienna University of Technology) has been successfully applied over the last 15 years. Because OeBB tunnels are designed for a lifetime of 150 years, the long‐term reliability of the support structures is of paramount interest. This provides the motivation for the development of hybrid methods applicable during the entire service life of tunnels, including also inner linings and segmental linings. The required extensions are intended to be carried out within a research program. The paper describes the state‐of‐the‐art and projected future developments.


  • Gebirgsdruckabhängige Tübbing‐Öffnungsvarianten für Querschläge beim Koralmtunnel KAT3 – Entwicklung von Sicherungstypen zum Einfahren von Querschlagvortrieben in Tübbingröhre

    by Georg Atzl, Gerd Josmann, Werner Fleissner, Bernd Moritz, Dieter Handke, Jaka Zevnik, Karl Schiesser, Andreas Kiesling

    The southern tube of the Koralm Tunnel, contract KAT3, is being conventionally excavated with two‐pass lining, while the northern tube is being driven by TBM with single‐pass segment lining. The tunnel tubes are located in quite different geotechnical conditions, with soft ground of high and low permeability, major fault zones and hard rock. Cross passages are provided about every 500 m of the 12 km long tunnel section. Different support types are required for the opening of the segment lining and connection to the excavation of the cross passage. In hard rock, the support consists of anchors, tail void grout and permanent bolts between the segments. In soft ground, a temporary pre‐stressed steel structure is provided, with longitudinal dowels at ring joints and special segments with increased reinforcement for the special case where cross passage excavation enters the segment‐lined tunnel.


  • In‐situ assessment of strain behaviour inside tunnel linings using distributed fibre optic sensors

    by Christoph M. Monsberger, Werner Lienhart, Bernd Moritz

    In modern tunnelling, deformation monitoring is an important component to ensure a safe construction. It is state of the art to measure displacements at the inner side of the tunnel lining using total stations. In addition, pointwise geotechnical sensors, e.g. electric strain gauges, may be installed in geological fault zones, which, however, do not deliver a complete picture of the internal deformations. The Institute of Engineering Geodesy and Measurement Systems (Graz University of Technology) supported by the Austrian Federal Railways (ÖBB‐Infrastruktur AG, SAE Fachbereich Bautechnik/Tunnelbau) developed a fibre optic sensing system, which realizes thousands of measurement points inside the tunnel lining. The distributed measurements can be used to assess the in‐situ strain behaviour as well as to localize failures (e.g. cracks) in the lining. This paper reports about the calibration of the fibre optic system under well‐known laboratory conditions and the practical utilization of the system in mechanized and conventional tunnelling. The results demonstrate the high potential of distributed fibre optic systems and their capability especially in the operational phase to extend classical measurement methods in tunnelling projects.


  • Bedding improvement of lining segments using geotextile tubes

    by Michael R. Henzinger, Andreas Lange, Günther M. Volkmann, Bernd A. Moritz, Wulf Schubert

    During a shield TBM excavation in hard rock, the immediate backfill of the crown immediately behind the shield is technically difficult to realize. With the advance of the cutter head a relocation process of pea gravel within the annular gap is triggered, leading to an insufficient bedding distribution of the first segments behind the shield tail and to an ovalization of the segmental lining at a certain load level. During a test application as part of an ”TBM research initiative“ of the Austrian Federal Railways geotextile tubes were integrated into the exterior surface of the segments. Immediately after leaving the shield tail, the geotextile tube, which is placed all around one ring of segments, is expanded by injection with grout. As a result, an immediate bedding between the rock mass and segmental lining is established, also preventing the rearrangement of pea gravel within the annular gap when the shield is moved forward. The displacement measurements have shown that the ring of segments equipped with geotextile tubes experiences a more rigid body motion like behaviour after leaving the shield tail with a minimal ovalization only. Numerical simulations show the influence of bedding improvement on the ovalization of the ring of segments after leaving the shield tail.


  • Detection of voids in the annular gap using ground penetrating radar and determination of the in‐situ deformation properties of pea gravel

    by Michael R. Henzinger, Michael Willmes, Manuel Lagger, Andreas F. Kathage, Bernd A. Moritz, Wulf Schubert

    When using shield machines, the excavation support is established using prefabricated concrete segments. The structurally required cavity between the built ring and the rock mass is usually filled with pea gravel in hard rock conditions. The backfilled material ensures the necessary bedding and evenly distributes the rock loads. To evaluate the in‐situ deformation behaviour of pea gravel, a testing device was developed that measures the reaction of the backfill under load increase and load decrease on the basis of the static load plate test. The test is carried out via the opening for pea gravel injection. The results have shown that the elasticity of pea gravel is predominantly influenced by the load level and the type of loading.Subsequently, the detectability of possible voids in the annular gap was evaluated by means of ground penetration radar. For this purpose, the feasibility of the measurements was confirmed by a numerical study. Furthermore, the boundary conditions and the propagation behaviour of the electromagnetic waves could be demonstrated. With calibration measurements, the electromagnetic properties of all components involved in the system segmental lining and annular gap were determined. An extensive series of analogue model tests confirmed the detectability of the transitions from dry, wet and water‐saturated pea gravel to water‐ and air‐filled voids. In the final series of experiments, the transition between pea gravel and hollow space in the annular gap was successfully detected at on‐site installed lining segments.


  • The Koralmtunnel underground emergency stop - Geotechnical design and construction

    by Harald Hölzl, Thomas Pilgerstorfer, Robert Uschan, Hanns Wagner, Bernd Moritz

  • Austrian Southern-Railway-Link-Conference

    by Robert Galler, Bernd Moritz