An Equivalent Synchronization for Phasor Measurements in Power Networks
- 1 September 2017
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Abstract
This paper deals with the problem of synchronizing phasor measurements in different nodes of a power network. Usually, this issue is faced by using a synchronization signal provided by wired or wireless communication infrastructure. As it is well known, the most common implementation of such a solution is the so-called Phasor Measurement Unit (PMU) which relies on a time reference signal coming from the GPS system. In this work, an alternative approach based on asynchronous measurements is presented and discussed. In particular, it is firstly shown how an equivalent synchronization among different nodes can be obtained by performing voltage and current measurements in all the nodes of the considered network. After that, an equivalent synchronization when only 75% of the nodes are monitored, is presented.Keywords
This publication has 6 references indexed in Scilit:
- A novel equivalent power network impedance approach for assessing the time reference in asynchronous measurements2017
- Distribution system state estimation using unsynchronized phasor measurements2012
- An Iterative Two-Terminal Fault-Location Method Based on Unsynchronized PhasorsIEEE Transactions on Power Delivery, 2008
- Two-end unsynchronized fault location algorithm for double-circuit series compensated lines2008
- Accurate Location of Faults on Power Transmission Lines With Use of Two-End Unsynchronized MeasurementsIEEE Transactions on Power Delivery, 2006
- Unsynchronized two-terminal fault location estimationIEEE Transactions on Power Delivery, 1996