Abstract
Epoxy‐coated reinforcement (ECR) as a means of protection against chloride‐induced corrosion of steel in concrete is used in only a few countries due to doubts concerning its effectiveness. A common misconception is that possible defects in the coating are particularly weak points as these might favour high local corrosion rates and thus loss of steel cross‐section. This work discusses why a certain number of small defects can be tolerated. It is argued that prolongation of the initiation phase is caused by a higher critical chloride content compared with uncoated steel due to the “size effect”. Additionally, the propagation phase for ECR is likely to be extended due to the severely restricted cathodic area that limits the corrosion rate. This paper presents experimental and numerical tests to verify these assumptions.Keywords
This publication has 8 references indexed in Scilit:
- Epoxidharzbeschichtete BewehrungBeton- und Stahlbetonbau, 2014
- Deterioration model and input parameters for reinforcement corrosionStructural Concrete, 2012
- Probabilistic considerations on the effect of specimen size on the critical chloride content in reinforced concreteCorrosion Science, 2011
- Modelling of reinforcement corrosion – geometrical effects on macrocell corrosionMaterials and Corrosion, 2010
- Critical chloride content in reinforced concrete — A reviewCement and Concrete Research, 2009
- Chloride Corrosion Threshold of Reinforcing Steel in Alkaline Solutions—Effect of Specimen SizeCorrosion, 2004
- The effect of specimen size on the measured pitting potential of stainless steelCorrosion Science, 1996
- Resistance for Flow of Current to a DiskJournal of the Electrochemical Society, 1966