Sylvia Keßler
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Sylvia Keßler has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Christoph Gehlen
Chair of Materials Science and Testing, Centre for Building Materials (cbm), School of Engineering and Design, Technical University of Munich, 85748 Garching, Germany
6 shared publications - Ueli Angst
Durability of Engineering Materials Institute for Building Materials, ETH Zurich Zurich Switzerland
3 shared publications - Marc Zintel
TU München, Centrum Baustoffe und Materialprüfung, Baumbachstr. 7, 81245 Munich, Germany
2 shared publications A Strauss
Institute of Structural Engineering, University of Natural Resources and Life Sciences
1 shared publication- Bernhard Elsener
Dipartimento di Scienze Chimiche e Geologiche, Università di Cagliari, Cittadella Universitaria , Monserrato, Cagliari I-09042
1 shared publication Charlotte Thiel
TU München
1 shared publication
Latest Publications
- 1 June 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Infrastructure Systems
- Vol. 23 (2)
Reliability Evaluation of Half-Cell Potential Measurement Using POD
The detection of corrosion in reinforced concrete structures is one of the primary tasks during inspection. The most common inspection method used is the half-cell potential method. From half-cell potential readings, a judgment is made by allocating investigated structural concrete surfaces to either corrosion detected or corrosion not detected. In this paper, the development of so-called probability of (corrosion) detection (POD) curves is presented. A numerical approach is presented for evaluating the POD in reinforced concrete structures. The probability that a defect, in this case represented by a corroding (anodically acting) area of the reinforcement steel, can be detected was calculated in dependency to electrolytic resistance of concrete, to the concrete cover, and to the grid size chosen for inspection. If parts exposed to different moisture condition are evaluated in one data set, the reliability of corrosion detection can be strongly impaired. If uniformly exposed surfaces are considere...
- 1 June 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Infrastructure Systems
- Vol. 23 (2)
Reliability Evaluation of Half-Cell Potential Measurement Using POD
The detection of corrosion in reinforced concrete structures is one of the primary tasks during inspection. The most common inspection method used is the half-cell potential method. From half-cell potential readings, a judgment is made by allocating investigated structural concrete surfaces to either corrosion detected or corrosion not detected. In this paper, the development of so-called probability of (corrosion) detection (POD) curves is presented. A numerical approach is presented for evaluating the POD in reinforced concrete structures. The probability that a defect, in this case represented by a corroding (anodically acting) area of the reinforcement steel, can be detected was calculated in dependency to electrolytic resistance of concrete, to the concrete cover, and to the grid size chosen for inspection. If parts exposed to different moisture condition are evaluated in one data set, the reliability of corrosion detection can be strongly impaired. If uniformly exposed surfaces are considere...
- 3 April 2017
- Published by Wiley in Beton- und Stahlbetonbau
- Vol. 112 (4) , 198-206
Einfluss einer Betonbeschichtung auf die Mechanismen der Bewehrungskorrosion in gerissenem Stahlbeton
Die Dauerhaftigkeit von chloridexponierten Stahlbetonbauwerken kann durch Rissbildung erheblich reduziert werden. Durch die Risse können Chloride vergleichsweise rasch zur Bewehrung gelangen und Bewehrungskorrosion initiieren. Daher wird in einschlägigen Regelwerken [1, 2] vorgegeben, bei besonders gefährdeten Bauwerken wie Parkdecks dem Eindringen von Chloriden durch zusätzliche Maßnahmen dauerhaft entgegenzuwirken. Das DBV‐Merkblatt „Parkhäuser und Tiefgaragen” [3] enthält verschiedene Entwurfsgrundsätze und Ausführungsvarianten zur Sicherstellung der Dauerhaftigkeit. Eine Variante sieht vor, gemäß dem Instandsetzungsprinzip W‐Cl nach RL SIB [4] bzw. dem Verfahren 8.3 nach DIN EN 1504‐9 [5] die Betonoberfläche mit einem rissüberbrückenden Oberflächenschutzsystem (OS) nach abgeschlossener Rissbildung zu verschließen, um eine weitere Chlorid‐ und Feuchtezufuhr zu verhindern und damit den elektrischen Widerstand des Betons zu erhöhen.In einem umfangreichen Experimentalprogramm konnte für die Situation „bewehrungskreuzende Biegerisse” gezeigt werden, dass nach zeitweiser Chloridexposition, wie sie in Parkhäusern über eine Winterperiode im unbeschichteten Zustand zu erwarten ist, durch eine Betonbeschichtung zuvor bereits aktivierte Makroelementströme maßgeblich reduziert bis vollständig gestoppt wurden. Der Erfolg dieser Maßnahme beruht auf dem Anstieg des anodischen Polarisationswiderstands aufgrund von Deckschichtbildung und/oder unzureichendem Nachschub von Chloriden. Der Einfluss der Erhöhung des Elektrolytwiderstands auf das Makrokorrosionselement durch Austrocknung des Betons ist vernachlässigbar. Noch nicht abschließend geklärt ist die Frage nach dem höchstzulässigen Chloridgehalt, der im Beton verbleiben darf, damit auch nach einer Beschichtung keine Bewehrungskorrosion mit standsicherheitsrelevanten Querschnittsverlusten initiiert bzw. aufrecht erhalten wird.
- 3 April 2017
- Published by Wiley in Beton- und Stahlbetonbau
- Vol. 112 (4) , 198-206
Einfluss einer Betonbeschichtung auf die Mechanismen der Bewehrungskorrosion in gerissenem Stahlbeton
Die Dauerhaftigkeit von chloridexponierten Stahlbetonbauwerken kann durch Rissbildung erheblich reduziert werden. Durch die Risse können Chloride vergleichsweise rasch zur Bewehrung gelangen und Bewehrungskorrosion initiieren. Daher wird in einschlägigen Regelwerken [1, 2] vorgegeben, bei besonders gefährdeten Bauwerken wie Parkdecks dem Eindringen von Chloriden durch zusätzliche Maßnahmen dauerhaft entgegenzuwirken. Das DBV‐Merkblatt „Parkhäuser und Tiefgaragen” [3] enthält verschiedene Entwurfsgrundsätze und Ausführungsvarianten zur Sicherstellung der Dauerhaftigkeit. Eine Variante sieht vor, gemäß dem Instandsetzungsprinzip W‐Cl nach RL SIB [4] bzw. dem Verfahren 8.3 nach DIN EN 1504‐9 [5] die Betonoberfläche mit einem rissüberbrückenden Oberflächenschutzsystem (OS) nach abgeschlossener Rissbildung zu verschließen, um eine weitere Chlorid‐ und Feuchtezufuhr zu verhindern und damit den elektrischen Widerstand des Betons zu erhöhen.In einem umfangreichen Experimentalprogramm konnte für die Situation „bewehrungskreuzende Biegerisse” gezeigt werden, dass nach zeitweiser Chloridexposition, wie sie in Parkhäusern über eine Winterperiode im unbeschichteten Zustand zu erwarten ist, durch eine Betonbeschichtung zuvor bereits aktivierte Makroelementströme maßgeblich reduziert bis vollständig gestoppt wurden. Der Erfolg dieser Maßnahme beruht auf dem Anstieg des anodischen Polarisationswiderstands aufgrund von Deckschichtbildung und/oder unzureichendem Nachschub von Chloriden. Der Einfluss der Erhöhung des Elektrolytwiderstands auf das Makrokorrosionselement durch Austrocknung des Betons ist vernachlässigbar. Noch nicht abschließend geklärt ist die Frage nach dem höchstzulässigen Chloridgehalt, der im Beton verbleiben darf, damit auch nach einer Beschichtung keine Bewehrungskorrosion mit standsicherheitsrelevanten Querschnittsverlusten initiiert bzw. aufrecht erhalten wird.
- 27 December 2016
- Published by Springer Nature in Materials and Structures
- Vol. 50 (2) , 121
Effect of freeze–thaw damage on chloride ingress into concrete
- 27 December 2016
- Published by Springer Nature in Materials and Structures
- Vol. 50 (2) , 121
Effect of freeze–thaw damage on chloride ingress into concrete
- 17 November 2016
- Published by Springer Nature
- p. 521-537
Present and Future Probabilistic Challenges for Maintenance of Reinforced Concrete Structures
- 17 November 2016
- Published by Springer Nature
- p. 521-537
Present and Future Probabilistic Challenges for Maintenance of Reinforced Concrete Structures
- 30 March 2016
- Published by Wiley in Materials and Corrosion
- Vol. 67 (6) , 631-638
Epoxy‐coated reinforcement in concrete structures: Results of a Swiss pilot project after 24 years of field exposure
Reinforced concrete is the most common construction material of civil infrastructure. In severe environment, e.g., chloride exposure, concrete deterioration can occur with consequences on the durability of the structure. The use of epoxy‐coated reinforcement is a strategy to control chloride‐induced reinforcement corrosion, particular by prolonging the initiation and propagation phase. The epoxy‐coating acts as a physical barrier to chlorides and the electrolyte concrete. However, the effectiveness of the strategy in chloride environment and the corrosion performance of ECR in presence of coating defects is investigated by condition assessment of a Swiss pilot project after 24 years of field exposure.
- 30 March 2016
- Published by Wiley in Materials and Corrosion
- Vol. 67 (6) , 631-638
Epoxy‐coated reinforcement in concrete structures: Results of a Swiss pilot project after 24 years of field exposure
Reinforced concrete is the most common construction material of civil infrastructure. In severe environment, e.g., chloride exposure, concrete deterioration can occur with consequences on the durability of the structure. The use of epoxy‐coated reinforcement is a strategy to control chloride‐induced reinforcement corrosion, particular by prolonging the initiation and propagation phase. The epoxy‐coating acts as a physical barrier to chlorides and the electrolyte concrete. However, the effectiveness of the strategy in chloride environment and the corrosion performance of ECR in presence of coating defects is investigated by condition assessment of a Swiss pilot project after 24 years of field exposure.
- 20 March 2015
- Published by Wiley in Structural Concrete
- Vol. 16 (3) , 398-405
Defects in epoxy‐coated reinforcement and their impact on the service life of a concrete structure
Epoxy‐coated reinforcement (ECR) as a means of protection against chloride‐induced corrosion of steel in concrete is used in only a few countries due to doubts concerning its effectiveness. A common misconception is that possible defects in the coating are particularly weak points as these might favour high local corrosion rates and thus loss of steel cross‐section. This work discusses why a certain number of small defects can be tolerated. It is argued that prolongation of the initiation phase is caused by a higher critical chloride content compared with uncoated steel due to the “size effect”. Additionally, the propagation phase for ECR is likely to be extended due to the severely restricted cathodic area that limits the corrosion rate. This paper presents experimental and numerical tests to verify these assumptions.
- 20 March 2015
- Published by Wiley in Structural Concrete
- Vol. 16 (3) , 398-405
Defects in epoxy‐coated reinforcement and their impact on the service life of a concrete structure
Epoxy‐coated reinforcement (ECR) as a means of protection against chloride‐induced corrosion of steel in concrete is used in only a few countries due to doubts concerning its effectiveness. A common misconception is that possible defects in the coating are particularly weak points as these might favour high local corrosion rates and thus loss of steel cross‐section. This work discusses why a certain number of small defects can be tolerated. It is argued that prolongation of the initiation phase is caused by a higher critical chloride content compared with uncoated steel due to the “size effect”. Additionally, the propagation phase for ECR is likely to be extended due to the severely restricted cathodic area that limits the corrosion rate. This paper presents experimental and numerical tests to verify these assumptions.
- 3 January 2014
- Published by Wiley in Beton- und Stahlbetonbau
- Vol. 109 (1) , 3-14
Epoxidharzbeschichtete Bewehrung
Um die Korrosion von Stahl in Beton infolge Chlorideinwirkung zu ver‐ oder zumindest zu behindern, werden bisher vornehmlich in Nordamerika beachtliche Mengen epoxidharzbeschichteter Bewehrung (ECR) eingesetzt. Die Wirkungsweise und damit das Korrosionsschutzpotenzial von ECR werden in der Wissenschaft jedoch zum Teil kontrovers diskutiert. Nicht zuletzt aufgrund fehlender Informationen über das Langzeitverhalten von ECR fand bisher kein nachhaltiger Technologietransfer nach Deutschland bzw. Europa statt. Nichtsdestotrotz wurde in den Jahren 1989 und 1991 diese Art des Korrosionsschutzes erstmalig in zwei Pilotprojekten (Brückenbauwerke) in der Schweiz und Deutschland eingesetzt. Die dargestellten Untersuchungsergebnisse im Zuge einer Bauwerksinspektion nach über zwei Jahrzehnten Nutzungsdauer liefern einen entscheidenden Baustein zur quantitativen Bewertung des Korrosionsschutzpotenzials epoxidharzbeschichteter Bewehrung. Die Resultate zeigen, dass sich die Epoxidharzbeschichtung auch nach mehr als 20 Jahren im Beton in einem guten, funktionsfähigen Zustand befindet. Zusätzlich wird anhand von Laborversuchen der mögliche Effekt eines erhöhten kritischen Chloridgehalts bei ECR‐Einsatz (an Fehlstellen < 50 mm2) erstmals nachgewiesen. Eine hierdurch resultierende Lebensdauerverlängerung wird über eine erste Lebensdauerberechnung abgeschätzt.Epoxy‐coated reinforcement – New findings after two decades of practical experienceEpoxy‐coated reinforcement (ECR) as a measure against chloride‐induced corrosion of steel in concrete has until now particularly in North America been used in considerable amounts. Nevertheless, in literature the mechanism of action and the potential corrosion protection effect of ECR are controversially discussed. The lack of information concerning the long‐term behavior of ECR in concrete is one of the main reasons for the low level of application of ECR in Germany or Europe in general. In 1989 and 1991, two road bridges were constructed with ECR as pilot projects in both Switzerland and Germany. This paper presents results from condition assessments of the two bridges after more than two decades of service life. The results show that the epoxy coating is still in a good and functional condition after more than 20 years in concrete. In addition, possible higher critical chloride contents at small defects of ECR (< 50 mm2) have been verified in laboratory tests for the first time. The possible resulting service life prolongation is assessed by first service life calculations.
- 3 January 2014
- Published by Wiley in Beton- und Stahlbetonbau
- Vol. 109 (1) , 3-14
Epoxidharzbeschichtete Bewehrung
Um die Korrosion von Stahl in Beton infolge Chlorideinwirkung zu ver‐ oder zumindest zu behindern, werden bisher vornehmlich in Nordamerika beachtliche Mengen epoxidharzbeschichteter Bewehrung (ECR) eingesetzt. Die Wirkungsweise und damit das Korrosionsschutzpotenzial von ECR werden in der Wissenschaft jedoch zum Teil kontrovers diskutiert. Nicht zuletzt aufgrund fehlender Informationen über das Langzeitverhalten von ECR fand bisher kein nachhaltiger Technologietransfer nach Deutschland bzw. Europa statt. Nichtsdestotrotz wurde in den Jahren 1989 und 1991 diese Art des Korrosionsschutzes erstmalig in zwei Pilotprojekten (Brückenbauwerke) in der Schweiz und Deutschland eingesetzt. Die dargestellten Untersuchungsergebnisse im Zuge einer Bauwerksinspektion nach über zwei Jahrzehnten Nutzungsdauer liefern einen entscheidenden Baustein zur quantitativen Bewertung des Korrosionsschutzpotenzials epoxidharzbeschichteter Bewehrung. Die Resultate zeigen, dass sich die Epoxidharzbeschichtung auch nach mehr als 20 Jahren im Beton in einem guten, funktionsfähigen Zustand befindet. Zusätzlich wird anhand von Laborversuchen der mögliche Effekt eines erhöhten kritischen Chloridgehalts bei ECR‐Einsatz (an Fehlstellen < 50 mm2) erstmals nachgewiesen. Eine hierdurch resultierende Lebensdauerverlängerung wird über eine erste Lebensdauerberechnung abgeschätzt.Epoxy‐coated reinforcement – New findings after two decades of practical experienceEpoxy‐coated reinforcement (ECR) as a measure against chloride‐induced corrosion of steel in concrete has until now particularly in North America been used in considerable amounts. Nevertheless, in literature the mechanism of action and the potential corrosion protection effect of ECR are controversially discussed. The lack of information concerning the long‐term behavior of ECR in concrete is one of the main reasons for the low level of application of ECR in Germany or Europe in general. In 1989 and 1991, two road bridges were constructed with ECR as pilot projects in both Switzerland and Germany. This paper presents results from condition assessments of the two bridges after more than two decades of service life. The results show that the epoxy coating is still in a good and functional condition after more than 20 years in concrete. In addition, possible higher critical chloride contents at small defects of ECR (< 50 mm2) have been verified in laboratory tests for the first time. The possible resulting service life prolongation is assessed by first service life calculations.