Abstract
This research investigates the application of the parrot optimizer (PO) algorithm and the artemisinin optimization (AO) algorithm to determine the optimal placement of solar‐powered distributed generators (SP‐DGs) within the standard IEEE 33‐node, 69‐node, and the Vietnamese Hoang Dieu 26‐node distribution power networks (DPNs). Both algorithms were implemented to minimize active power loss under peak load conditions for a one‐hour period. The optimal placement problem was analyzed for two scenarios of renewable‐based distributed generation (RBDG) operation: Case 1 (pure active power generation) and Case 2 (active and reactive power generation). The performance of the two algorithms was compared against previous studies to identify a more effective approach. Furthermore, the AO algorithm was applied to minimize the total one‐year energy loss (OYEL) in the Hoang Dieu 26‐node DPN, utilizing real solar radiation data for Hoang Dieu Street in Ho Chi Minh City, Vietnam, obtained from a solar global atlas. The findings indicate that AO demonstrates superior effectiveness compared to PO and certain existing algorithms for the two standard DPNs. For the Hoang Dieu 26‐node DPN, AO achieved significant reductions in OYEL, suggesting its suitability for optimally placing and operating RBDGs to yield substantial benefits for this specific network.

This publication has 31 references indexed in Scilit: