Construction Safety Risk Assessment for Underground Structures in Military Hospital Projects Using Activity-Based Failure Mode and Effects Analysis (FMEA)
Open Access
- 5 February 2025
- conference paper
- Published by MDPI AG in Engineering Proceedings
- Vol. 84 (1) , 33
Abstract
The Indonesian government is currently focusing on infrastructure development, including military infrastructure to strengthen national defense. One of these projects is the development of the Indonesian Army Central Hospital, which is being continually expanded with facilities such as proton beam therapy. Due to its underground construction, special attention must be given to construction safety to prevent workplace accidents. This study focuses on assessing construction safety risks at the military hospital using activity-based failure modes and effects analysis (FMEA). The research methodology employed is a mixed-method approach involving 5 construction safety experts and 100 respondents directly involved in underground structure construction. Descriptive data analysis was conducted, serving as the basis for calculating risk priority numbers (RPN) using the FMEA method. Three main activities were identified with very high risks ranked from 1 to 10: lifting of contiguous pile casing, basement excavation, and installation of cast in situ bored pile gutter. These activities entail safety risks with RPN values ranging from 100 to 125, including worker’s hands being caught in tools/materials, being struck by tools/materials, falling/slipping into excavations, and being buried/struck by excavated soil. This research has positive implications as a reference for developing construction safety plans that include risk identification, risk assessment, and determination of control measures.Keywords
Funding Information
- Republic of Indonesia Defense University (021/PK/VI/2024/LPPM)
This publication has 17 references indexed in Scilit:
- Analysis of Fatal Construction Accidents in Indonesia—A Case StudyBuildings, 2024
- Development of Activity-Based Safety Plan for Precast Parapet Panel Work in Elevated Construction2022
- STRATEGI PEMBANGUNAN INDUSTRI PERTAHANAN PADA NEGARA KEPULAUAN GUNA MENDUKUNG PERTAHANAN NEGARAJurnal Academia Praja, 2021
- Fuzzy failure mode and effect analysis application to reduce risk level in a ready-mixed concrete plant: A fuzzy rule based system modelling approachMathematics and Computers in Simulation, 2020
- Failure mode and effect analysis improvement: A systematic literature review and future research agendaReliability Engineering & System Safety, 2020
- Development of Safety Plan Based on Work Breakdown Structure to Determine Safety Cost for Precast Concrete Bridge Construction Projects. Case Study: Girder Erection with Launching Gantry MethodCivil Engineering and Architecture, 2020
- Design of Underground Structures2020
- Healthcare Systems Engineering2015
- Work at Height Fatalities in the Repair, Maintenance, Alteration, and Addition WorksJournal of Construction Engineering and Management, 2008
- Construction safety management: an exploratory study from ChinaConstruction Innovation, 2004