Pungky Dharma Saputra
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Interests
Pungky Dharma Saputra has a total of 24 co-authors. Here are the top co-authors by number of shared publications:
- Anasya Arsita Laksmi
Department of Water Resource Engineering, Republic of Indonesia Defense University, Bogor 16810, Indonesia
6 shared publications - Muhammad Hamzah Fansuri
Department of Civil Engineering, Republic of Indonesia Defense University, Bogor 16810, Indonesia
6 shared publications - Nina Purwanti
Republic of Indonesia Defense University
3 shared publications - M. Ragil
Department of Civil Engineering, Faculty of Defense Science and Technology, Republic of Indonesia Defense University, Bogor 16810, Indonesia
2 shared publications - Madeline Nauli Basa Simbolon
Department of Civil Engineering, Faculty of Defense Science and Technology, Republic of Indonesia Defense University, Bogor 16810, Indonesia
2 shared publications - Okri Asfino Putra
Department of Civil Engineering, Republic of Indonesia Defense University, Bogor 16810, Indonesia
2 shared publications
Latest Publications
- Open Access
- 31 October 2026
- Published by "IMS" Vogosca in Science, Engineering and Technology
- Vol. 6 (2) , 366-377
Integrated Geotechnical and Seismic Stability Assessment of Tropical Residual Slopes in Sitinjau Lauik, West Sumatra, Indonesia
Sitinjau Lauik, a national road corridor in West Sumatra, Indonesia, is one of the most landslide-prone segments of the Bukit Barisan volcanic belt. This study assesses the geotechnical and seismic stability of three tropical residual soil slopes at this location by combining cone penetration testing (CPT), laboratory index testing, consolidated-drained direct shear testing (DST), and Morgenstern–Price limit-equilibrium analysis under static and pseudo-static seismic loading. CPT profiles revealed a weak layer (qc = 0.4–0.6 MPa) at 1.2–2.8 m depth in Slope 1. This slope also has a high plasticity index (PI = 39.7%), a high void ratio (e = 1.50), and a low dry density (γd = 10.06 kN/m³), resulting in lower shear-strength parameters (c' = 17.8 kPa, φ' = 19.2°) than Slopes 2 and 3 (PI < 10%). Static factors of safety (FS) were 1.08, 1.54, and 1.49 for Slopes 1, 2, and 3, respectively. A pseudo-static coefficient of kh = 0.15, consistent with regional peak ground acceleration zoning, reduced the FS values to 0.77, 1.23, and 1.17, making Slope 1 unstable during earthquakes. At kh = 0.20, none of the slopes met the minimum FS of 1.1 required by the Indonesian National Standard (SNI) 8460:2017. High plasticity, a high void ratio, and low CPT resistance distinguished the critical Slope 1 from the other slopes. Because only three slopes were examined, these findings are site-specific; nevertheless, they provide a basis for prioritizing slope remediation and early warning along this corridor.
- 31 October 2026
- Published by "IMS" Vogosca in Science, Engineering and Technology
- Vol. 6 (2) , 366-377
Open AccessIntegrated Geotechnical and Seismic Stability Assessment of Tropical Residual Slopes in Sitinjau Lauik, West Sumatra, Indonesia
Sitinjau Lauik, a national road corridor in West Sumatra, Indonesia, is one of the most landslide-prone segments of the Bukit Barisan volcanic belt. This study assesses the geotechnical and seismic stability of three tropical residual soil slopes at this location by combining cone penetration testing (CPT), laboratory index testing, consolidated-drained direct shear testing (DST), and Morgenstern–Price limit-equilibrium analysis under static and pseudo-static seismic loading. CPT profiles revealed a weak layer (qc = 0.4–0.6 MPa) at 1.2–2.8 m depth in Slope 1. This slope also has a high plasticity index (PI = 39.7%), a high void ratio (e = 1.50), and a low dry density (γd = 10.06 kN/m³), resulting in lower shear-strength parameters (c' = 17.8 kPa, φ' = 19.2°) than Slopes 2 and 3 (PI < 10%). Static factors of safety (FS) were 1.08, 1.54, and 1.49 for Slopes 1, 2, and 3, respectively. A pseudo-static coefficient of kh = 0.15, consistent with regional peak ground acceleration zoning, reduced the FS values to 0.77, 1.23, and 1.17, making Slope 1 unstable during earthquakes. At kh = 0.20, none of the slopes met the minimum FS of 1.1 required by the Indonesian National Standard (SNI) 8460:2017. High plasticity, a high void ratio, and low CPT resistance distinguished the critical Slope 1 from the other slopes. Because only three slopes were examined, these findings are site-specific; nevertheless, they provide a basis for prioritizing slope remediation and early warning along this corridor.
- Open Access
- 30 October 2025
- Published by Universitas Atma Jaya Yogyakarta in Jurnal Teknik Sipil
- Vol. 18 (3) , 157-167
ANALISIS PERHITUNGAN LIFTING PLAN PADA PEKERJAAN KONSTRUKSI BREAKWATER TERMINAL LPG JAWA TIMUR
This study aims to analyze the lifting plan calculation in offshore pile installation works for breakwater construction at the East Java Refrigerated LPG Terminal Project Phase 2. The research employs a descriptive quantitative approach through direct field observation of lifting activities using a crawler crane operating on a working barge. The analysis includes the calculation of total lifting load, dynamic load correction using the dynamic amplification factor (DAF), effective crane capacity based on the load chart, as well as evaluation of crane utilization and safety factor as indicators of operational safety. The results indicate that the lifting of steel pipe piles from the service barge to the working barge achieved a crane utilization of 65.29% with a safety factor of 1.53, representing a safe and optimal condition. In the pile-to-launch lifting process using a pile gripper, utilization increased to 81.38% with a safety factor of 1.23, indicating a near-critical operational condition. Meanwhile, lifting operations involving the vibro hammer and impact hammer showed utilization levels of 49.25% and 75.18%, respectively, with safety factors above 1.33, indicating safe to highly safe conditions. Overall, the findings demonstrate that lifting plan performance is strongly influenced by equipment configuration, lifting load, and offshore environmental conditions, highlighting the need for comprehensive technical evaluation to ensure operational safety and efficiency. Keywords: Lifting plan, Crawler crane, Dynamic amplification factor, Safety factor ,Offshore construction
- 30 October 2025
- Published by Universitas Atma Jaya Yogyakarta in Jurnal Teknik Sipil
- Vol. 18 (3) , 157-167
Open AccessANALISIS PERHITUNGAN LIFTING PLAN PADA PEKERJAAN KONSTRUKSI BREAKWATER TERMINAL LPG JAWA TIMUR
This study aims to analyze the lifting plan calculation in offshore pile installation works for breakwater construction at the East Java Refrigerated LPG Terminal Project Phase 2. The research employs a descriptive quantitative approach through direct field observation of lifting activities using a crawler crane operating on a working barge. The analysis includes the calculation of total lifting load, dynamic load correction using the dynamic amplification factor (DAF), effective crane capacity based on the load chart, as well as evaluation of crane utilization and safety factor as indicators of operational safety. The results indicate that the lifting of steel pipe piles from the service barge to the working barge achieved a crane utilization of 65.29% with a safety factor of 1.53, representing a safe and optimal condition. In the pile-to-launch lifting process using a pile gripper, utilization increased to 81.38% with a safety factor of 1.23, indicating a near-critical operational condition. Meanwhile, lifting operations involving the vibro hammer and impact hammer showed utilization levels of 49.25% and 75.18%, respectively, with safety factors above 1.33, indicating safe to highly safe conditions. Overall, the findings demonstrate that lifting plan performance is strongly influenced by equipment configuration, lifting load, and offshore environmental conditions, highlighting the need for comprehensive technical evaluation to ensure operational safety and efficiency. Keywords: Lifting plan, Crawler crane, Dynamic amplification factor, Safety factor ,Offshore construction
- 31 May 2025
- Published by Politeknik Negeri Jakarta in Construction and Material Journal
- Vol. 7 (1) , 103-132
ANALISIS KRITERIA PEMILIHAN METODE KONSTRUKSI CAPPING BEAM TANGGUL PENGAMAN PANTAI NCICD JAKARTA UTARA
Banjir tahunan yang melanda Ibu Kota Republik Indonesia merupakan salah satu permasalahan krusial yang sedang dikaji dengan solusi yang tercantum dalam master plan NCICD (National Capital Integrated Coastal Development). Struktur atas tanggul yang berupa capping beam berfungsi dalam memecah gelombang, menyatukan rangkaian spun pile, dan menjaga stabilitas spun pile. Tujuan utama penelitian ini yakni mengidentifikasi kriteria-kriteria pada pemilihan metode konstruksi capping beam di proyek pengembangan tanggul pengaman pantai NCICD. Metode yang digunakan yakni pendekatan secara sistematis terhadap literatur yang dipublikasikan dalam bentuk artikel atau jurnal dan publikasi ilmiah. Hasil penelitian menunjukkan terdapat sembilan kriteria dalam pemilihan metode konstruksi capping beam. Kriteria yang banyak dibahas dan berpengaruh dominan adalah kriteria biaya dan kondisi lingkungan sekitar dengan masing-masing memiliki persentase 19%. Studi ini memberikan wawasan yang penting untuk para akademisi dan praktisi dalam mengembangkan strategi dalam pemilihan metode konstruksi.
- 31 May 2025
- Published by Politeknik Negeri Jakarta in Construction and Material Journal
- Vol. 7 (1) , 103-132
ANALISIS KRITERIA PEMILIHAN METODE KONSTRUKSI CAPPING BEAM TANGGUL PENGAMAN PANTAI NCICD JAKARTA UTARA
Banjir tahunan yang melanda Ibu Kota Republik Indonesia merupakan salah satu permasalahan krusial yang sedang dikaji dengan solusi yang tercantum dalam master plan NCICD (National Capital Integrated Coastal Development). Struktur atas tanggul yang berupa capping beam berfungsi dalam memecah gelombang, menyatukan rangkaian spun pile, dan menjaga stabilitas spun pile. Tujuan utama penelitian ini yakni mengidentifikasi kriteria-kriteria pada pemilihan metode konstruksi capping beam di proyek pengembangan tanggul pengaman pantai NCICD. Metode yang digunakan yakni pendekatan secara sistematis terhadap literatur yang dipublikasikan dalam bentuk artikel atau jurnal dan publikasi ilmiah. Hasil penelitian menunjukkan terdapat sembilan kriteria dalam pemilihan metode konstruksi capping beam. Kriteria yang banyak dibahas dan berpengaruh dominan adalah kriteria biaya dan kondisi lingkungan sekitar dengan masing-masing memiliki persentase 19%. Studi ini memberikan wawasan yang penting untuk para akademisi dan praktisi dalam mengembangkan strategi dalam pemilihan metode konstruksi.
- 31 May 2025
- Published by Politeknik Negeri Jakarta in Construction and Material Journal
- Vol. 7 (1) , 79-93
IDENTIFIKASI AKTIVITAS PEKERJAAN PEMANCANGAN DENGAN METODE INNER BORING PADA PROYEK PEMBANGUNAN TANGGUL PENGAMAN PANTAI NCICD
Pembangunan infrastruktur pesisir menjadi langkah strategis dalam mitigasi banjir rob di Jakarta Utara. Salah satu proyek utama adalah pembangunan tanggul pengaman pantai dalam program National Capital Integrated Coastal Development (NCICD). Penelitian ini bertujuan untuk mengidentifikasi tahapan pekerjaan pemancangan menggunakan metode inner boring pada konstruksi tanggul NCICD Fase A. Metode inner boring dipilih karena memiliki keunggulan dalam mengurangi kebisingan, getaran, dan pencemaran lingkungan dibandingkan metode konvensional.Penelitian ini menggunakan pendekatan campuran, yang mencakup analisis video ilustrasi metode kerja, dokumentasi proyek, serta survei dan validasi pakar. Hasil penelitian mengidentifikasi 6 aktivitas utama dalam pekerjaan pemancangan: pemasangan sling, pengangkatan tiang pancang, penggeseran dan penyetelan titik bor, pemasangan auger, pengeboran, dan pembuangan galian. Aktivitas-aktivitas ini kemudian dikembangkan dalam struktur rincian kerja (Work Breakdown Structure, WBS) untuk meningkatkan efisiensi dan efektivitas pekerjaan konstruksi.Hasil validasi oleh para pakar menunjukkan bahwa rangkaian aktivitas yang telah diidentifikasi dapat digunakan sebagai acuan dalam proyek konstruksi pesisir serupa. Penelitian ini diharapkan dapat menjadi referensi dalam perencanaan konstruksi tanggul masa depan, khususnya dalam optimalisasi waktu, sumber daya, dan keselamatan kerja.
- 31 May 2025
- Published by Politeknik Negeri Jakarta in Construction and Material Journal
- Vol. 7 (1) , 79-93
IDENTIFIKASI AKTIVITAS PEKERJAAN PEMANCANGAN DENGAN METODE INNER BORING PADA PROYEK PEMBANGUNAN TANGGUL PENGAMAN PANTAI NCICD
Pembangunan infrastruktur pesisir menjadi langkah strategis dalam mitigasi banjir rob di Jakarta Utara. Salah satu proyek utama adalah pembangunan tanggul pengaman pantai dalam program National Capital Integrated Coastal Development (NCICD). Penelitian ini bertujuan untuk mengidentifikasi tahapan pekerjaan pemancangan menggunakan metode inner boring pada konstruksi tanggul NCICD Fase A. Metode inner boring dipilih karena memiliki keunggulan dalam mengurangi kebisingan, getaran, dan pencemaran lingkungan dibandingkan metode konvensional.Penelitian ini menggunakan pendekatan campuran, yang mencakup analisis video ilustrasi metode kerja, dokumentasi proyek, serta survei dan validasi pakar. Hasil penelitian mengidentifikasi 6 aktivitas utama dalam pekerjaan pemancangan: pemasangan sling, pengangkatan tiang pancang, penggeseran dan penyetelan titik bor, pemasangan auger, pengeboran, dan pembuangan galian. Aktivitas-aktivitas ini kemudian dikembangkan dalam struktur rincian kerja (Work Breakdown Structure, WBS) untuk meningkatkan efisiensi dan efektivitas pekerjaan konstruksi.Hasil validasi oleh para pakar menunjukkan bahwa rangkaian aktivitas yang telah diidentifikasi dapat digunakan sebagai acuan dalam proyek konstruksi pesisir serupa. Penelitian ini diharapkan dapat menjadi referensi dalam perencanaan konstruksi tanggul masa depan, khususnya dalam optimalisasi waktu, sumber daya, dan keselamatan kerja.
- Open Access
- 28 February 2025
- Published by PT Avenew Indonesia in Journal of Project Management Research
- Vol. 1 (1) , 54-71
Risk Assessment of Factors Causing Production Delays in Precast Housing Panel Production
Production delays are a common issue in the use of precast technology in construction. An evaluation of the completed production process indicates that delays occur at each stage of the precast housing panel production activities. The purpose of this research is to conduct a risk assessment of the factors causing production delays in precast housing panel production. The research object of this study is precast housing panels. This study is designed using a mixed-methods approach and will be conducted in two main phases: identifying risk factors causing production delays and assessing these risks. The risk identification process will involve experts providing expert judgment. Subsequently, a respondent survey will be conducted to assess the impact of each variable on production delays. Following the initial risk identification phase, the second phase involves a risk assessment analyzed using the Probability Impact Matrix (PIM). Ten risk variables have been identified as factors influencing production delays in precast housing panels. Among these, nine are categorized as high-risk variables, while one is classified as moderate risk. The identified risk variables include design, materials, equipment, human resources, management, finance, administration, weather, accidents, and force majeure, all of which impact production delays in precast housing panels. Based on the analysis using the Probability Impact Matrix (PIM), the high-risk variables, in descending order, are human resources, weather, force majeure, design, accidents, materials, equipment, finance, and administration. The moderate-risk variable, ranked last, is management.
- 28 February 2025
- Published by PT Avenew Indonesia in Journal of Project Management Research
- Vol. 1 (1) , 54-71
Open AccessRisk Assessment of Factors Causing Production Delays in Precast Housing Panel Production
Production delays are a common issue in the use of precast technology in construction. An evaluation of the completed production process indicates that delays occur at each stage of the precast housing panel production activities. The purpose of this research is to conduct a risk assessment of the factors causing production delays in precast housing panel production. The research object of this study is precast housing panels. This study is designed using a mixed-methods approach and will be conducted in two main phases: identifying risk factors causing production delays and assessing these risks. The risk identification process will involve experts providing expert judgment. Subsequently, a respondent survey will be conducted to assess the impact of each variable on production delays. Following the initial risk identification phase, the second phase involves a risk assessment analyzed using the Probability Impact Matrix (PIM). Ten risk variables have been identified as factors influencing production delays in precast housing panels. Among these, nine are categorized as high-risk variables, while one is classified as moderate risk. The identified risk variables include design, materials, equipment, human resources, management, finance, administration, weather, accidents, and force majeure, all of which impact production delays in precast housing panels. Based on the analysis using the Probability Impact Matrix (PIM), the high-risk variables, in descending order, are human resources, weather, force majeure, design, accidents, materials, equipment, finance, and administration. The moderate-risk variable, ranked last, is management.
- Open Access
- 7 February 2025
- Published by MDPI AG in Engineering Proceedings
- Vol. 84 (1) , 36
Risk Priority Number Measurement for Construction Safety Risks in Upper Structure Projects of Military Airbase Hangars Based on Activity
Aircraft hangars are essential in the aviation industry, providing crucial maintenance and protection for aviation assets. However, constructing these upper structures involves significant safety risks. Due to the complexity of upper structure construction, it is vital to prioritize safety to prevent workplace accidents. Ensuring construction safety is not only crucial for operational efficiency but also aligns with several Sustainable Development Goals (SDGs), such as Decent Work and Economic Growth (SDG 8) and Industry, Innovation, and Infrastructure (SDG 9). This study assesses the safety risks associated with hangar construction using activity-based failure modes and effects analysis (FMEA). A mixed-method approach is adopted, incorporating insights from five construction safety experts and data from 100 individuals directly involved in the upper structure construction of the spaceframe hangar. Descriptive data analysis was employed to establish the foundation for computing risk priority numbers (RPNs) using the FMEA technique. Three primary activities were identified as having extremely high risks: workers falling from heights during the lifting and erection of the space frame, workers falling from heights during basement excavation while installing floor slab formwork, and workers falling from heights during the casting of floor slabs. These activities present safety risks with RPN values ranging from 64 to 100, including incidents of workers falling from heights and being struck by materials. This study serves as a crucial reference for formulating construction safety plans that encompass risk identification, assessment, and control measures. The findings provide essential insights into various safety hazards in construction projects, particularly those related to military infrastructure. By identifying and assessing these risks, the research facilitates the development of more effective and comprehensive safety protocols. Implementing the recommended control measures ensures a proactive approach to mitigating potential accidents and injuries. Consequently, this research contributes to academic knowledge and enhances safety standards and practices within the construction industry.
- 7 February 2025
- Published by MDPI AG in Engineering Proceedings
- Vol. 84 (1) , 36
Open AccessRisk Priority Number Measurement for Construction Safety Risks in Upper Structure Projects of Military Airbase Hangars Based on Activity
Aircraft hangars are essential in the aviation industry, providing crucial maintenance and protection for aviation assets. However, constructing these upper structures involves significant safety risks. Due to the complexity of upper structure construction, it is vital to prioritize safety to prevent workplace accidents. Ensuring construction safety is not only crucial for operational efficiency but also aligns with several Sustainable Development Goals (SDGs), such as Decent Work and Economic Growth (SDG 8) and Industry, Innovation, and Infrastructure (SDG 9). This study assesses the safety risks associated with hangar construction using activity-based failure modes and effects analysis (FMEA). A mixed-method approach is adopted, incorporating insights from five construction safety experts and data from 100 individuals directly involved in the upper structure construction of the spaceframe hangar. Descriptive data analysis was employed to establish the foundation for computing risk priority numbers (RPNs) using the FMEA technique. Three primary activities were identified as having extremely high risks: workers falling from heights during the lifting and erection of the space frame, workers falling from heights during basement excavation while installing floor slab formwork, and workers falling from heights during the casting of floor slabs. These activities present safety risks with RPN values ranging from 64 to 100, including incidents of workers falling from heights and being struck by materials. This study serves as a crucial reference for formulating construction safety plans that encompass risk identification, assessment, and control measures. The findings provide essential insights into various safety hazards in construction projects, particularly those related to military infrastructure. By identifying and assessing these risks, the research facilitates the development of more effective and comprehensive safety protocols. Implementing the recommended control measures ensures a proactive approach to mitigating potential accidents and injuries. Consequently, this research contributes to academic knowledge and enhances safety standards and practices within the construction industry.
- Open Access
- 5 February 2025
- Published by MDPI AG in Engineering Proceedings
- Vol. 84 (1) , 33
Construction Safety Risk Assessment for Underground Structures in Military Hospital Projects Using Activity-Based Failure Mode and Effects Analysis (FMEA)
The Indonesian government is currently focusing on infrastructure development, including military infrastructure to strengthen national defense. One of these projects is the development of the Indonesian Army Central Hospital, which is being continually expanded with facilities such as proton beam therapy. Due to its underground construction, special attention must be given to construction safety to prevent workplace accidents. This study focuses on assessing construction safety risks at the military hospital using activity-based failure modes and effects analysis (FMEA). The research methodology employed is a mixed-method approach involving 5 construction safety experts and 100 respondents directly involved in underground structure construction. Descriptive data analysis was conducted, serving as the basis for calculating risk priority numbers (RPN) using the FMEA method. Three main activities were identified with very high risks ranked from 1 to 10: lifting of contiguous pile casing, basement excavation, and installation of cast in situ bored pile gutter. These activities entail safety risks with RPN values ranging from 100 to 125, including worker’s hands being caught in tools/materials, being struck by tools/materials, falling/slipping into excavations, and being buried/struck by excavated soil. This research has positive implications as a reference for developing construction safety plans that include risk identification, risk assessment, and determination of control measures.
- 5 February 2025
- Published by MDPI AG in Engineering Proceedings
- Vol. 84 (1) , 33
Open AccessConstruction Safety Risk Assessment for Underground Structures in Military Hospital Projects Using Activity-Based Failure Mode and Effects Analysis (FMEA)
The Indonesian government is currently focusing on infrastructure development, including military infrastructure to strengthen national defense. One of these projects is the development of the Indonesian Army Central Hospital, which is being continually expanded with facilities such as proton beam therapy. Due to its underground construction, special attention must be given to construction safety to prevent workplace accidents. This study focuses on assessing construction safety risks at the military hospital using activity-based failure modes and effects analysis (FMEA). The research methodology employed is a mixed-method approach involving 5 construction safety experts and 100 respondents directly involved in underground structure construction. Descriptive data analysis was conducted, serving as the basis for calculating risk priority numbers (RPN) using the FMEA method. Three main activities were identified with very high risks ranked from 1 to 10: lifting of contiguous pile casing, basement excavation, and installation of cast in situ bored pile gutter. These activities entail safety risks with RPN values ranging from 100 to 125, including worker’s hands being caught in tools/materials, being struck by tools/materials, falling/slipping into excavations, and being buried/struck by excavated soil. This research has positive implications as a reference for developing construction safety plans that include risk identification, risk assessment, and determination of control measures.
- Open Access
- 15 April 2024
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 517, 05002
Development of Work Breakdown Structure (WBS) for Rapid Damage Runway Repair (RADARR) Time Planning at Military Airbases
The military airbase plays a crucial role in national defense, particularly in air defense. One of the most critical facilities at a military airbase for supporting air operations is the runway that serves as the area where fighter aircraft take off and land; hence. If such an event occurs, the Air Force’s capability, specifically the ability of fighter aircraft to take off and land, would be compromised, disrupting air operations. Therefore, the rapid damage runway repair (RADARR) method, aligned with the rigid pavement construction approach, is essential. The foundation of the construction implementation involves creating a Work Breakdown Structure (WBS) as a reference for RADARR operation planning. This study aims to develop a WBS as the basis for RADARR operation time planning. The research method employed is a mixed-method approach with descriptive analysis. The variables under investigation include work packages, construction methods, work activities, and the duration of operations. This study comprises expert judgment, pilot surveys, respondent surveys, and focus group discussion (FGD) followed by the development of RADARR WBS, measure the operational time of RADARR through respondent surveys. These findings serve as a valuable reference for executing RADARR construction work within the military context.
- 15 April 2024
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 517, 05002
Open AccessDevelopment of Work Breakdown Structure (WBS) for Rapid Damage Runway Repair (RADARR) Time Planning at Military Airbases
The military airbase plays a crucial role in national defense, particularly in air defense. One of the most critical facilities at a military airbase for supporting air operations is the runway that serves as the area where fighter aircraft take off and land; hence. If such an event occurs, the Air Force’s capability, specifically the ability of fighter aircraft to take off and land, would be compromised, disrupting air operations. Therefore, the rapid damage runway repair (RADARR) method, aligned with the rigid pavement construction approach, is essential. The foundation of the construction implementation involves creating a Work Breakdown Structure (WBS) as a reference for RADARR operation planning. This study aims to develop a WBS as the basis for RADARR operation time planning. The research method employed is a mixed-method approach with descriptive analysis. The variables under investigation include work packages, construction methods, work activities, and the duration of operations. This study comprises expert judgment, pilot surveys, respondent surveys, and focus group discussion (FGD) followed by the development of RADARR WBS, measure the operational time of RADARR through respondent surveys. These findings serve as a valuable reference for executing RADARR construction work within the military context.
- Open Access
- 26 September 2022
- Published by Elsevier in Solid Earth Sciences
- Vol. 7 (4) , 252-267
Effects of various factors on behaviors of piles and foundation soils due to seismic shaking
- 26 September 2022
- Published by Elsevier in Solid Earth Sciences
- Vol. 7 (4) , 252-267
Open AccessEffects of various factors on behaviors of piles and foundation soils due to seismic shaking