PSPungky Dharma Saputra

Pungky Dharma Saputra

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Pungky Dharma Saputra has a total of 24 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Integrated Geotechnical and Seismic Stability Assessment of Tropical Residual Slopes in Sitinjau Lauik, West Sumatra, Indonesia

    by Okri Asfino Putra, Hamdeni Medriosa, Fajar Nugroho, Muhammad Hamzah Fansuri, Pungky Dharma Saputra, Anasya Arsita Laksmi

    Sitinjau Lauik, a national road corridor in West Sumatra, Indonesia, is one of the most landslide-prone segments of the Bukit Barisan volcanic belt. This study assesses the geotechnical and seismic stability of three tropical residual soil slopes at this location by combining cone penetration testing (CPT), laboratory index testing, consolidated-drained direct shear testing (DST), and Morgenstern–Price limit-equilibrium analysis under static and pseudo-static seismic loading. CPT profiles revealed a weak layer (qc = 0.4–0.6 MPa) at 1.2–2.8 m depth in Slope 1. This slope also has a high plasticity index (PI = 39.7%), a high void ratio (e = 1.50), and a low dry density (γd = 10.06 kN/m³), resulting in lower shear-strength parameters (c' = 17.8 kPa, φ' = 19.2°) than Slopes 2 and 3 (PI < 10%). Static factors of safety (FS) were 1.08, 1.54, and 1.49 for Slopes 1, 2, and 3, respectively. A pseudo-static coefficient of kh = 0.15, consistent with regional peak ground acceleration zoning, reduced the FS values to 0.77, 1.23, and 1.17, making Slope 1 unstable during earthquakes. At kh = 0.20, none of the slopes met the minimum FS of 1.1 required by the Indonesian National Standard (SNI) 8460:2017. High plasticity, a high void ratio, and low CPT resistance distinguished the critical Slope 1 from the other slopes. Because only three slopes were examined, these findings are site-specific; nevertheless, they provide a basis for prioritizing slope remediation and early warning along this corridor.

  • Developing of a Model of Factors Influencing the Selection of Construction Methods for Upper Structure Works in Military Building Projects

    by Khansa Norita, Pungky Dharma Saputra, Okri Asfino Putra, Muhammad Hamzah Fansuri, Anasya Arsita Laksmi, Sayed Ahmad Fauzan

  • Open Access

    ANALISIS PERHITUNGAN LIFTING PLAN PADA PEKERJAAN KONSTRUKSI BREAKWATER TERMINAL LPG JAWA TIMUR

    by Febri Dwi Setiawan, Pungky Dharma Saputra

    This study aims to analyze the lifting plan calculation in offshore pile installation works for breakwater construction at the East Java Refrigerated LPG Terminal Project Phase 2. The research employs a descriptive quantitative approach through direct field observation of lifting activities using a crawler crane operating on a working barge. The analysis includes the calculation of total lifting load, dynamic load correction using the dynamic amplification factor (DAF), effective crane capacity based on the load chart, as well as evaluation of crane utilization and safety factor as indicators of operational safety. The results indicate that the lifting of steel pipe piles from the service barge to the working barge achieved a crane utilization of 65.29% with a safety factor of 1.53, representing a safe and optimal condition. In the pile-to-launch lifting process using a pile gripper, utilization increased to 81.38% with a safety factor of 1.23, indicating a near-critical operational condition. Meanwhile, lifting operations involving the vibro hammer and impact hammer showed utilization levels of 49.25% and 75.18%, respectively, with safety factors above 1.33, indicating safe to highly safe conditions. Overall, the findings demonstrate that lifting plan performance is strongly influenced by equipment configuration, lifting load, and offshore environmental conditions, highlighting the need for comprehensive technical evaluation to ensure operational safety and efficiency. Keywords: Lifting plan, Crawler crane, Dynamic amplification factor, Safety factor ,Offshore construction

  • ANALISIS KRITERIA PEMILIHAN METODE KONSTRUKSI CAPPING BEAM TANGGUL PENGAMAN PANTAI NCICD JAKARTA UTARA

    by Khansa Norita, Pungky Dharma Saputra, Yanda Dwira Firman Z

    Banjir tahunan yang melanda Ibu Kota Republik Indonesia merupakan salah satu permasalahan krusial yang sedang dikaji dengan solusi yang tercantum dalam master plan NCICD (National Capital Integrated Coastal Development). Struktur atas tanggul yang berupa capping beam berfungsi dalam memecah gelombang, menyatukan rangkaian spun pile, dan menjaga stabilitas spun pile. Tujuan utama penelitian ini yakni mengidentifikasi kriteria-kriteria pada pemilihan metode konstruksi capping beam di proyek pengembangan tanggul pengaman pantai NCICD. Metode yang digunakan yakni pendekatan secara sistematis terhadap literatur yang dipublikasikan dalam bentuk artikel atau jurnal dan publikasi ilmiah. Hasil penelitian menunjukkan terdapat sembilan kriteria dalam pemilihan metode konstruksi capping beam. Kriteria yang banyak dibahas dan berpengaruh dominan adalah kriteria biaya dan kondisi lingkungan sekitar dengan masing-masing memiliki persentase 19%. Studi ini memberikan wawasan yang penting untuk para akademisi dan praktisi dalam mengembangkan strategi dalam pemilihan metode konstruksi.


  • IDENTIFIKASI AKTIVITAS PEKERJAAN PEMANCANGAN DENGAN METODE INNER BORING PADA PROYEK PEMBANGUNAN TANGGUL PENGAMAN PANTAI NCICD

    by Rifdah Fadilah, Pungky Dharma Saputra, Gian Asnawi Siagian

    Pembangunan infrastruktur pesisir menjadi langkah strategis dalam mitigasi banjir rob di Jakarta Utara. Salah satu proyek utama adalah pembangunan tanggul pengaman pantai dalam program National Capital Integrated Coastal Development (NCICD). Penelitian ini bertujuan untuk mengidentifikasi tahapan pekerjaan pemancangan menggunakan metode inner boring pada konstruksi tanggul NCICD Fase A. Metode inner boring dipilih karena memiliki keunggulan dalam mengurangi kebisingan, getaran, dan pencemaran lingkungan dibandingkan metode konvensional.Penelitian ini menggunakan pendekatan campuran, yang mencakup analisis video ilustrasi metode kerja, dokumentasi proyek, serta survei dan validasi pakar. Hasil penelitian mengidentifikasi 6 aktivitas utama dalam pekerjaan pemancangan: pemasangan sling, pengangkatan tiang pancang, penggeseran dan penyetelan titik bor, pemasangan auger, pengeboran, dan pembuangan galian. Aktivitas-aktivitas ini kemudian dikembangkan dalam struktur rincian kerja (Work Breakdown Structure, WBS) untuk meningkatkan efisiensi dan efektivitas pekerjaan konstruksi.Hasil validasi oleh para pakar menunjukkan bahwa rangkaian aktivitas yang telah diidentifikasi dapat digunakan sebagai acuan dalam proyek konstruksi pesisir serupa. Penelitian ini diharapkan dapat menjadi referensi dalam perencanaan konstruksi tanggul masa depan, khususnya dalam optimalisasi waktu, sumber daya, dan keselamatan kerja.

  • Open Access

    Risk Assessment of Factors Causing Production Delays in Precast Housing Panel Production

    by Pungky Dharma Saputra, Mohammad Ichsan

    Production delays are a common issue in the use of precast technology in construction. An evaluation of the completed production process indicates that delays occur at each stage of the precast housing panel production activities. The purpose of this research is to conduct a risk assessment of the factors causing production delays in precast housing panel production. The research object of this study is precast housing panels. This study is designed using a mixed-methods approach and will be conducted in two main phases: identifying risk factors causing production delays and assessing these risks. The risk identification process will involve experts providing expert judgment. Subsequently, a respondent survey will be conducted to assess the impact of each variable on production delays. Following the initial risk identification phase, the second phase involves a risk assessment analyzed using the Probability Impact Matrix (PIM). Ten risk variables have been identified as factors influencing production delays in precast housing panels. Among these, nine are categorized as high-risk variables, while one is classified as moderate risk. The identified risk variables include design, materials, equipment, human resources, management, finance, administration, weather, accidents, and force majeure, all of which impact production delays in precast housing panels. Based on the analysis using the Probability Impact Matrix (PIM), the high-risk variables, in descending order, are human resources, weather, force majeure, design, accidents, materials, equipment, finance, and administration. The moderate-risk variable, ranked last, is management.

  • Open Access

    Risk Priority Number Measurement for Construction Safety Risks in Upper Structure Projects of Military Airbase Hangars Based on Activity

    by Madeline Nauli Basa Simbolon, Pungky Dharma Saputra, M Ragil

    Aircraft hangars are essential in the aviation industry, providing crucial maintenance and protection for aviation assets. However, constructing these upper structures involves significant safety risks. Due to the complexity of upper structure construction, it is vital to prioritize safety to prevent workplace accidents. Ensuring construction safety is not only crucial for operational efficiency but also aligns with several Sustainable Development Goals (SDGs), such as Decent Work and Economic Growth (SDG 8) and Industry, Innovation, and Infrastructure (SDG 9). This study assesses the safety risks associated with hangar construction using activity-based failure modes and effects analysis (FMEA). A mixed-method approach is adopted, incorporating insights from five construction safety experts and data from 100 individuals directly involved in the upper structure construction of the spaceframe hangar. Descriptive data analysis was employed to establish the foundation for computing risk priority numbers (RPNs) using the FMEA technique. Three primary activities were identified as having extremely high risks: workers falling from heights during the lifting and erection of the space frame, workers falling from heights during basement excavation while installing floor slab formwork, and workers falling from heights during the casting of floor slabs. These activities present safety risks with RPN values ranging from 64 to 100, including incidents of workers falling from heights and being struck by materials. This study serves as a crucial reference for formulating construction safety plans that encompass risk identification, assessment, and control measures. The findings provide essential insights into various safety hazards in construction projects, particularly those related to military infrastructure. By identifying and assessing these risks, the research facilitates the development of more effective and comprehensive safety protocols. Implementing the recommended control measures ensures a proactive approach to mitigating potential accidents and injuries. Consequently, this research contributes to academic knowledge and enhances safety standards and practices within the construction industry.


  • Open Access

    Construction Safety Risk Assessment for Underground Structures in Military Hospital Projects Using Activity-Based Failure Mode and Effects Analysis (FMEA)

    by Pungky Dharma Saputra, Muhammad Hamzah Fansuri, Anasya Arsita Laksmi, M Ragil, Madeline Nauli Basa Simbolon

    The Indonesian government is currently focusing on infrastructure development, including military infrastructure to strengthen national defense. One of these projects is the development of the Indonesian Army Central Hospital, which is being continually expanded with facilities such as proton beam therapy. Due to its underground construction, special attention must be given to construction safety to prevent workplace accidents. This study focuses on assessing construction safety risks at the military hospital using activity-based failure modes and effects analysis (FMEA). The research methodology employed is a mixed-method approach involving 5 construction safety experts and 100 respondents directly involved in underground structure construction. Descriptive data analysis was conducted, serving as the basis for calculating risk priority numbers (RPN) using the FMEA method. Three main activities were identified with very high risks ranked from 1 to 10: lifting of contiguous pile casing, basement excavation, and installation of cast in situ bored pile gutter. These activities entail safety risks with RPN values ranging from 100 to 125, including worker’s hands being caught in tools/materials, being struck by tools/materials, falling/slipping into excavations, and being buried/struck by excavated soil. This research has positive implications as a reference for developing construction safety plans that include risk identification, risk assessment, and determination of control measures.


  • Open Access

    Development of Work Breakdown Structure (WBS) for Rapid Damage Runway Repair (RADARR) Time Planning at Military Airbases

    by Pungky Dharma Saputra, Muhammad Hamzah Fansuri, Anasya Arsita Laksmi

    The military airbase plays a crucial role in national defense, particularly in air defense. One of the most critical facilities at a military airbase for supporting air operations is the runway that serves as the area where fighter aircraft take off and land; hence. If such an event occurs, the Air Force’s capability, specifically the ability of fighter aircraft to take off and land, would be compromised, disrupting air operations. Therefore, the rapid damage runway repair (RADARR) method, aligned with the rigid pavement construction approach, is essential. The foundation of the construction implementation involves creating a Work Breakdown Structure (WBS) as a reference for RADARR operation planning. This study aims to develop a WBS as the basis for RADARR operation time planning. The research method employed is a mixed-method approach with descriptive analysis. The variables under investigation include work packages, construction methods, work activities, and the duration of operations. This study comprises expert judgment, pilot surveys, respondent surveys, and focus group discussion (FGD) followed by the development of RADARR WBS, measure the operational time of RADARR through respondent surveys. These findings serve as a valuable reference for executing RADARR construction work within the military context.


  • Open Access

    Effects of various factors on behaviors of piles and foundation soils due to seismic shaking

    by Muhammad Hamzah Fansuri, Muhsiung Chang, Pungky Dharma Saputra, Nina Purwanti, Anasya Arsita Laksmi, Sabrina Harahap, Surya Dewi Puspitasari