Seismic Performance of the Full-Scale Prefabricated Concrete Column Connected in Half-Height: Experimental Study and Numerical Analysis
Open Access
- 11 December 2025
- Vol. 15 (24) , 4491
Abstract
To improve the seismic performance of prefabricated structures, this study suggested putting grouted sleeves at the half-height of the column (at the point of contraflexure). A quasi-static test under constant axial load was conducted on the full-scale cast-in-place column and the full-scale prefabricated column connected in half-height. The hysteresis loops, skeleton curves, ductility, stiffness degradation, and energy dissipation capacity were compared. The test results indicate that the prefabricated column connected in half-height exhibited reliable seismic performance. Compared with the cast-in-place specimen, the bearing capacity of the prefabricated column decreased by only 1.45%, the energy dissipation decreased by 5.61%, and the initial secant stiffness and ductility coefficient increased by 8.88% and 9.09%, respectively. ABAQUS finite element software was used to establish finite-element models based on the experimental results. The damage pattern and seismic performance indicators of the two types of columns were verified by resolving issues related to the bonding interface model of sleeve-connected columns and the convergence of the multidimensional constitutive model. The formula for calculating the shear bearing capacity was put forward to evaluate the failure pattern. The study provides a basis for further investigation of the seismic performance of sleeve-connected columns with different connection positions under extreme conditions.Keywords
This publication has 25 references indexed in Scilit:
- Severity of earthquake disasters triggered by MS≥5.0 events: retrospective analysis of 288 cases in China (1991–2020)Natural Hazards, 2025
- The carbon emissions of prefabricated building in urban renewal: Assessment and emission reduction pathEnergy and Buildings, 2025
- Simulation on seismic performance of the post‐fire precast concrete column with grouted sleeve connectionsStructural Concrete, 2023
- PRESSAFE-disp: a method for the fast in-plane seismic assessment of existing precast RC buildings after the Emilia earthquake of May 2012Bulletin of Earthquake Engineering, 2022
- Effect of reinforcement grade and concrete strength on seismic performance of reinforced concrete bridge piersEngineering Structures, 2019
- Seismic performance of precast RC and RC/ECC composite columns with grouted sleeve connectionsEngineering Structures, 2019
- Experimental study on seismic behavior of precast concrete column with grouted sleeve connections considering ratios of longitudinal reinforcement and stirrupsBulletin of Earthquake Engineering, 2018
- Quasi-static cyclic tests of precast bridge columns with different connection details for high seismic zonesEngineering Structures, 2018
- Grouted sleeve connections used in precast reinforced concrete construction – Experimental investigation of a column-to-column jointEngineering Structures, 2016
- A new ductile moment-resisting connection for precast concrete frames in seismic regions: An experimental investigationEngineering Structures, 2014