Using Weibull Analysis for Evaluation of Cost and Schedule Performance
- 1 December 2005
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 131 (12) , 1257-1262
Abstract
Large amounts of money are lost each year in the construction industry because of poor schedule and cost control. Few contractors specify and follow systematic schedule monitoring practices. Traditionally, the earned value method (EVM) is used to control and monitor schedule performance using the schedule and cost performance indices which compare the budgeted cost of work performed to what was originally scheduled or what is actually expended. This paper presents a statistical approach, namely Weibull analysis, to evaluate stochastically the schedule performance of construction or design projects. The approach can be used in conjunction with the EVM to enhance the evaluation and control of schedule performance. Weibull analysis is a common method for failure analysis and reliability engineering used in a wide range of applications. In this paper, the applicability of Weibull analysis for evaluating and comparing the reliability of the schedule performance of multiple projects is presented. The various st...Keywords
This publication has 5 references indexed in Scilit:
- EARNED VALUE METHOD AND CUSTOMER EARNED VALUEJournal of Construction Research, 2002
- Defining Cost/Schedule Performance Indices and Their Ranges for Design ProjectsJournal of Management in Engineering, 2001
- Defining a beta distribution function for construction simulation1999
- Statistical Properties of Construction Duration DataJournal of Construction Engineering and Management, 1992
- Introduction to Reliability Analysis1992