Rescheduling strategy of ready-mixed concrete vehicles: A case study of dynamic requirements of customers
Authors:
- 27 January 2016
- journal article
- research article
- Published by SAGE Publications in Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
- Vol. 231 (12) , 2223-2237
Abstract
Given dynamic variations in the scheduling environment for ready-mixed concrete vehicles, an advance schedule should be able to accommodate such changes. The authors studied the rescheduling characteristics of ready-mixed concrete vehicle fleet operations and measured the dynamics of randomly arriving customers’ requirements. Based on the study’s findings, a corresponding rescheduling strategy and a hybrid heuristic algorithm are proposed to optimize the rescheduling system for such vehicles. The simulation results validated the model and proved the effectiveness of the rescheduling strategy and the hybrid heuristic algorithm regarding the optimization of the rescheduling of ready-mixed concrete vehicles.Keywords
This publication has 23 references indexed in Scilit:
- A planning model with a solution algorithm for ready mixed concrete production and truck dispatching under stochastic travel timesEngineering Optimization, 2012
- The capacitated vehicle routing problem with stochastic demands and time windowsComputers & Operations Research, 2011
- Analysis, modeling and solution of the concrete delivery problemEuropean Journal of Operational Research, 2009
- Production scheduling and truck dispatching of ready mixed concreteTransportation Research Part E: Logistics and Transportation Review, 2008
- An optimal scheduling model for ready mixed concrete supply with overtime considerationsAutomation in Construction, 2007
- The vehicle rescheduling problem: Model and algorithmsNetworks, 2007
- Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concreteEuropean Journal of Operational Research, 2007
- Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucksAutomation in Construction, 2006
- Optimizing the schedule of dispatching RMC trucks through genetic algorithmsAutomation in Construction, 2004
- Application of stochastic real-valued reinforcement neural networks to batch production reschedulingProceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 1997