A planning model with a solution algorithm for ready mixed concrete production and truck dispatching under stochastic travel times
Authors:
- 1 April 2012
- journal article
- research article
- Published by Taylor & Francis in Engineering Optimization
- Vol. 44 (4) , 427-447
Abstract
In this study the authors employ network flow techniques to construct a systematic model that helps ready mixed concrete carriers effectively plan production and truck dispatching schedules under stochastic travel times. The model is formulated as a mixed integer network flow problem with side constraints. Problem decomposition and relaxation techniques, coupled with the CPLEX mathematical programming solver, are employed to develop an algorithm that is capable of efficiently solving the problems. A simulation-based evaluation method is also proposed to evaluate the model, coupled with a deterministic model, and the method currently used in actual operations. Finally, a case study is performed using real operating data from a Taiwan RMC firm. The test results show that the system operating cost obtained using the stochastic model is a significant improvement over that obtained using the deterministic model or the manual approach. Consequently, the model and the solution algorithm could be useful for actual operations.Keywords
This publication has 34 references indexed in Scilit:
- Supply chain management model for ready mixed concreteAutomation in Construction, 2011
- Dispatching ready mixed concrete trucks under demand postponement and weight limit regulationAutomation in Construction, 2010
- Inter-city bus scheduling for allied carriersTransportmetrica, 2010
- Short-term manpower planning for MRT carriage maintenance under mixed deterministic and stochastic demandsAnnals of Operations Research, 2010
- Ship scheduling and container shipment planning for liners in short-term operationsJournal of Marine Science and Technology, 2009
- An optimal scheduling model for ready mixed concrete supply with overtime considerationsAutomation in Construction, 2007
- Scheduling trucks in container terminals using a genetic algorithmEngineering Optimization, 2007
- Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucksAutomation in Construction, 2006
- Optimizing the schedule of dispatching RMC trucks through genetic algorithmsAutomation in Construction, 2004
- A REVISED SIMULATED ANNEALING AND CLUSTER-FIRST ROUTE-SECOND ALGORITHM APPLIED TO THE VEHICLE ROUTING PROBLEMEngineering Optimization, 1993