Abstract
The increasing demand for flexible energy storage and pure water production has motivated the development of integrated energy–water systems. Although standalone LAES systems can support large-scale storage, their performance is limited by the electricity required for air compression and liquefaction. Conventional desalination technologies also consume substantial energy and may cause environmental impacts. This study evaluates a multigeneration LAES system integrating LNG cold energy, solar energy, and hydrate-based desalination (LNG-HBD-SALAES). The results indicate that the system produces 2338.83 t/d of pure water and achieves an electrical round-trip efficiency (ERTE) of 144.16% and an overall exergy efficiency of 69.49%. Its economic viability at coastal LNG receiving terminals is examined through a life-cycle cost analysis using representative regional price scenarios. The system requires an initial investment of 90.59 million USD. Among the investigated regional price scenarios, the Liaoning scenario yields the lowest LCOE of 0.142 USD/kWh, whereas the Guangdong scenario provides the highest NPV of 198.12 million USD, with an IRR of 27.28%. Within the parameter ranges considered in this study, sensitivity analysis identifies the LNG regasification fee as the parameter producing the largest variation in project value, with the discount rate, tax rate, and equipment purchase cost next in importance. These parameters should therefore receive particular attention in project investment and operation planning. The assessment provides a reference for evaluating the technical feasibility and economic prospects of combined energy storage and pure water production.

This publication has 23 references indexed in Scilit: