Efficient Heuristics for Total Completion Time and Maximum Lateness Bicriteria Scheduling Problems
Author:
- 18 February 2020
- journal article
- research article
- Published by Trans Tech Publications, Ltd. in Advanced Engineering Forum
- Vol. 35, 110-121
Abstract
This paper considers the bicriteria scheduling problem of minimizing the total completion time and maximum lateness with zero release dates. The problem is NP hard, though Early Due Date (EDD) and Shortest Processing Time (SPT) rules yielded optimal solutions for maximum lateness and total completion time, respectively if each criterion were to be considered singly. Thus, the values of each of the criteria for the two proposed heuristics; SII and PI were compared to the optimal solution of the sub problems. Results of computational experiment on job sizes varies from 5-100 jobs showed that the two proposed solution methods yielded results not significantly different from the optimal. This is because the two heuristic yielded results not significantly from the optimal sub-problems for the two performance measures at 95% significant level.Keywords
This publication has 12 references indexed in Scilit:
- New Solution Methods for Single Machine Bicriteria Scheduling Problems: Minimizing the Total Flowtime and Maximum Tardiness with Zero Release DatesInternational Journal of Engineering Research in Africa, 2018
- Minimization of Total Tardiness and Total Flowtime on Single Machine with Non-Zero Release DatesInternational Journal of Engineering Research in Africa, 2017
- Minimizing Flow-Time on Unrelated Machines2015
- A Genetic Algorithm Approach for Minimizing Total Tardiness in Single Machine SchedulingInternational Journal of Industrial Engineering and Management, 2012
- Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problemComputers & Mathematics with Applications, 2010
- New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobsEuropean Journal of Operational Research, 2010
- Heuristics for minimizing total completion time and maximum lateness on identical parallel machines with setup timesJournal of Intelligent Manufacturing, 2008
- Minimizing total earliness and tardiness on a single machine using a hybrid heuristicComputers & Operations Research, 2007
- Heuristics for Minimizing Total Completion Time on Single Machine with Release TimeAdvanced Materials Research, 2007
- A survey and annotated bibliography of multiobjective combinatorial optimizationOR Spectrum, 2000