Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective
Author:
- 1 December 2005
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 43 (24) , 5253-5270
Abstract
Some well-known decision problems can be regarded as special cases of the resource-constrained project-scheduling problem (RCPSP) with respect to the structure of their mathematical models. These decision models include assembly line balancing, job shop scheduling and some packing problems. Here, the differences and similarities of mathematical models of the multilevel capacitated lot-sizing problem (MLCLSP) and the RCPSP are shown, and it is concluded that the RCPSP is a special case of the MLCLSP. This theoretical result is complemented by an integrated, general model formulation that allows one to coordinate customer-specific orders and make-to-stock (lot size) production at the master (production) planning level.Keywords
All Related Versions
This publication has 28 references indexed in Scilit:
- Campaign planning in time-indexed model formulationsInternational Journal of Production Research, 2005
- Plant co-ordination in pharmaceutics supply networksOR Spectrum, 2003
- An integrated survey of deterministic project schedulingOmega, 2001
- Packing problems and project scheduling models: an integrating perspectiveJournal of the Operational Research Society, 2000
- Resource-constrained project scheduling: Notation, classification, models, and methodsEuropean Journal of Operational Research, 1999
- A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methodsOR Spectrum, 1997
- Lot sizing and scheduling — Survey and extensionsEuropean Journal of Operational Research, 1997
- Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizingEuropean Journal of Operational Research, 1996
- Modelling setup times, process batches and transfer batches using activity network logicEuropean Journal of Operational Research, 1996
- The discrete lot-sizing and scheduling problemEuropean Journal of Operational Research, 1990