Late and early work scheduling: A survey
Abstract
No abstract availableKeywords
Funding Information
- Politechnika Poznańska
This publication has 70 references indexed in Scilit:
- A survey of scheduling problems with late work criteriaOmega, 2011
- Late work minimization in flow shops by a genetic algorithmComputers & Industrial Engineering, 2009
- Late work minimization in a small flexible manufacturing systemComputers & Industrial Engineering, 2007
- Two-machine flow-shop scheduling to minimize total late workEngineering Optimization, 2006
- Open shop scheduling problems with late work criteriaDiscrete Applied Mathematics, 2004
- Single machine scheduling to minimize total weighted late work: a comparison of scheduling rules and search algorithmsComputers & Industrial Engineering, 2002
- On the complexity of generalized due date scheduling problemsEuropean Journal of Operational Research, 1991
- Open Shop Scheduling to Minimize Finish TimeJournal of the ACM, 1976
- An extension of Johnson's results on job IDT schedulingNaval Research Logistics Quarterly, 1956
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954