Design Methodology for PVD Installation in Embankments over Soft Soils–A Case Study
- 6 June 2018
- conference paper
- Published by American Society of Civil Engineers (ASCE)
- p. 380-390
Abstract
Prefabricated vertical drains (PVDs) used for embankment construction over saturated soft cohesive soil deposits accelerate consolidation and reduce construction time by reducing the drainage path from tens of meters to 1–2 m. The current design methodologies assume undrained conditions in the cohesive soil deposit even after PVD’s are installed. This assumption is appropriate if the deposits are sufficiently thick such that excess pore pressures generated during construction do not dissipate before the next lift of soil is placed. However, for most cohesive soil deposits the drainage capability is significantly improved immediately after the installation of PVDs and the assumption of undrained conditions for design is overly conservative. This design assumption may render an embankment construction unfeasible unless ground improvement techniques are used to significantly enhance the foundation strength. This paper presents a hybrid drained-undrained (HDU) model for construction of embankments over soft soils that accounts for the improved soil drainage conditions after installation of PVDs and incorporates the drained shear strength of foundation soils as a function of the embankment construction time. A field case study is presented where the use of HDU model to analyze PVD installation helped construction of a mile long MSE berm in soft soil deposit without need for additional foundation improvement, thereby providing significant cost savings for the project.Keywords
This publication has 2 references indexed in Scilit:
- Stability Evaluation during Staged ConstructionJournal of Geotechnical Engineering, 1991
- New Design Procedure for Stability of Soft ClaysJournal of the Geotechnical Engineering Division, 1974