A multi-objective memetic algorithm for energy-efficient flow shop group scheduling problem with a dynamic speed-scaling mechanism
Authors:
- Shuaipeng YuanSYShuaipeng Yuan
- Bailin WangBWBailin Wang
- Sihan WangSWSihan Wang
- Yihan PeiYPYihan Pei
- Tieke LiTLTieke Li
- 13 April 2026
- journal article
- Published by Springer Nature in Annals of Operations Research
- Vol. 361 (2) , 923-955
Abstract
No abstract availableFunding Information
- National Natural Science Foundation of China (72301026)
- National Natural Science Foundation of China (71701016)
- Humanities and Social Science Fund of Ministry of Education of China (23YJA630090)
- Fundamental Research Funds for Central Universities of the Central South University (FRF-TP-24-026A)
This publication has 46 references indexed in Scilit:
- An environmentally friendly elective patient scheduling under the predict-then-optimize frameworkAnnals of Operations Research, 2025
- Complexity and heuristic algorithms for speed scaling scheduling of parallel jobs with energy constraintJournal of Computational and Applied Mathematics, 2024
- Three multi-objective memetic algorithms for observation scheduling problem of active-imaging agile earth observation satellitesAnnals of Operations Research, 2024
- A discrete differential evolution algorithm for flow shop group scheduling problem with sequence-dependent setup and transportation timesJournal of Intelligent Manufacturing, 2020
- Memetic algorithm with node and edge histogram for no-idle flow shop scheduling problem to minimize the makespan criterionApplied Soft Computing, 2017
- Permutation flowshop group scheduling with position-based learning effectComputers & Industrial Engineering, 2016
- Group-shop scheduling with sequence-dependent set-up and transportation timesApplied Mathematical Modelling, 2014
- An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup timesJournal of Intelligent Manufacturing, 2010
- Two-machine group scheduling problem with blocking and anticipatory setupsEuropean Journal of Operational Research, 1993
- Scheduling groups of jobs in the two-machine flow shopMathematical and Computer Modelling, 1990