Bailin Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Bailin Wang has a total of 29 co-authors. Here are the top co-authors by number of shared publications:
Tieke Li
8 shared publicationsShuaipeng Yuan
5 shared publications- Tieke Li
School of Economics and Management, University of Science and Technology Beijing
3 shared publications - Qing Liu
State Key Laboratory of Advanced Metallurgy, University of Science and Technology Beijing, Beijing, P.R. China
2 shared publications Yihan Pei
2 shared publications- Caoyun Zou
State Key Laboratory of Advanced Metallurgy, University of Science and Technology Beijing, Beijing 100083, China
1 shared publication
Latest Publications
- 13 April 2026
- Published by Springer Nature in Annals of Operations Research
- Vol. 361 (2) , 923-955
A multi-objective memetic algorithm for energy-efficient flow shop group scheduling problem with a dynamic speed-scaling mechanism
- 13 April 2026
- Published by Springer Nature in Annals of Operations Research
- Vol. 361 (2) , 923-955
A multi-objective memetic algorithm for energy-efficient flow shop group scheduling problem with a dynamic speed-scaling mechanism
- Open Access
- 15 May 2025
- Published by Iron and Steel Institute of Japan in ISIJ International
- Vol. 65 (5) , 630-643
A Disturbance Dynamic Evaluation Method for Steelmaking-continuous Casting Scheduling Based on Converter Processing Time Prediction and Disturbance Influence Process Analysis
Converter completion time delay caused by uncertain events is one of the most frequent disturbances in the steelmaking-continuous casting process (SCCP) with a significant negative impact on the SCCP scheduling. Existing rescheduling methods fall short in providing a comprehensive analysis and evaluation for the production status and disturbance levels, resulting in the scheduling scheme with limited adaptability to on-site environments. This paper addresses this challenge by proposing a dynamic evaluation method for converter scheduling disturbance based on processing time prediction and disturbance influence process analysis. The proposed method consists of three steps that solve the disturbance evaluation problem by predicting the converter processing time, analysing the delay impact of the converter completion time, and solving the real-time procedure buffer capacity. This enables the dynamic scheduling of the SCCP to accurately judge the current operating rhythm and production status, and to achieve precise decision-making for scheduling. Computational experiments based on the actual case from the Chinese steelmaking plants demonstrate the accuracy and effectiveness of the proposed method in large-scale SCCP dynamic scheduling processes. Compared with other methods, the proposed method can effectively reduce the number of rescheduling in production and the deviation of the production process from the initial scheduling scheme by reasonably selecting the scheduling repair strategy, which improves the adaptability of the scheduling scheme to the actual production environment.
- 15 May 2025
- Published by Iron and Steel Institute of Japan in ISIJ International
- Vol. 65 (5) , 630-643
Open AccessA Disturbance Dynamic Evaluation Method for Steelmaking-continuous Casting Scheduling Based on Converter Processing Time Prediction and Disturbance Influence Process Analysis
Converter completion time delay caused by uncertain events is one of the most frequent disturbances in the steelmaking-continuous casting process (SCCP) with a significant negative impact on the SCCP scheduling. Existing rescheduling methods fall short in providing a comprehensive analysis and evaluation for the production status and disturbance levels, resulting in the scheduling scheme with limited adaptability to on-site environments. This paper addresses this challenge by proposing a dynamic evaluation method for converter scheduling disturbance based on processing time prediction and disturbance influence process analysis. The proposed method consists of three steps that solve the disturbance evaluation problem by predicting the converter processing time, analysing the delay impact of the converter completion time, and solving the real-time procedure buffer capacity. This enables the dynamic scheduling of the SCCP to accurately judge the current operating rhythm and production status, and to achieve precise decision-making for scheduling. Computational experiments based on the actual case from the Chinese steelmaking plants demonstrate the accuracy and effectiveness of the proposed method in large-scale SCCP dynamic scheduling processes. Compared with other methods, the proposed method can effectively reduce the number of rescheduling in production and the deviation of the production process from the initial scheduling scheme by reasonably selecting the scheduling repair strategy, which improves the adaptability of the scheduling scheme to the actual production environment.
- Open Access
- 18 March 2024
- Published by MDPI AG in Mathematics
- Vol. 12 (6) , 888
Model and Algorithm for a Two-Machine Group Scheduling Problem with Setup and Transportation Time
This paper investigates a two-machine group scheduling problem with sequence-independent setup times and round-trip transportation times, which is derived from the production management requirements of modern steel manufacturing enterprises. The objective is to minimize the makespan. Addressing limitations in prior studies, we consider a critical but largely ignored transportation method, namely round-trip transportation, and restricted transporter capacity between machines. To solve this problem, a mixed-integer programming model is first developed. Then, the problem complexity is analyzed for situations with both single and unlimited transporters. For the NP-hard case of a single transporter, we design an efficient two-stage heuristic algorithm with proven acceptable solution quality bounds. Extensive computational experiments based on steel plant data demonstrate the effectiveness of our approach in providing near-optimal solutions, and the maximum deviation between our algorithm and the optimal solution is 1.38%. This research can provide an operable optimization method that is valuable for group scheduling and transportation scheduling.
- 18 March 2024
- Published by MDPI AG in Mathematics
- Vol. 12 (6) , 888
Open AccessModel and Algorithm for a Two-Machine Group Scheduling Problem with Setup and Transportation Time
This paper investigates a two-machine group scheduling problem with sequence-independent setup times and round-trip transportation times, which is derived from the production management requirements of modern steel manufacturing enterprises. The objective is to minimize the makespan. Addressing limitations in prior studies, we consider a critical but largely ignored transportation method, namely round-trip transportation, and restricted transporter capacity between machines. To solve this problem, a mixed-integer programming model is first developed. Then, the problem complexity is analyzed for situations with both single and unlimited transporters. For the NP-hard case of a single transporter, we design an efficient two-stage heuristic algorithm with proven acceptable solution quality bounds. Extensive computational experiments based on steel plant data demonstrate the effectiveness of our approach in providing near-optimal solutions, and the maximum deviation between our algorithm and the optimal solution is 1.38%. This research can provide an operable optimization method that is valuable for group scheduling and transportation scheduling.
- Open Access
- 15 August 2023
- Published by University of Slavonski Brod in Tehnicki vjesnik - Technical Gazette
- Vol. 30 (4) , 1241-1252
An Iterated Greedy Algorithm for a Parallel Machine Scheduling Problem with Re-entrant and Group Processing Features
This research paper addresses a novel parallel machine scheduling problem with re-entrant and group processing features, specifically motivated by the hot milling process in the modern steel manufacturing industry. The objective is to minimize the ma...
- 15 August 2023
- Published by University of Slavonski Brod in Tehnicki vjesnik - Technical Gazette
- Vol. 30 (4) , 1241-1252
Open AccessAn Iterated Greedy Algorithm for a Parallel Machine Scheduling Problem with Re-entrant and Group Processing Features
This research paper addresses a novel parallel machine scheduling problem with re-entrant and group processing features, specifically motivated by the hot milling process in the modern steel manufacturing industry. The objective is to minimize the ma...
- Top Cited Papers
- 26 June 2023
- Published by Elsevier in Socio-Economic Planning Sciences
- Vol. 88
Feasibility on the integration of passenger and freight transportation in rural areas: A service mode and an optimization model
- 26 June 2023
- Published by Elsevier in Socio-Economic Planning Sciences
- Vol. 88
Top Cited PapersFeasibility on the integration of passenger and freight transportation in rural areas: A service mode and an optimization model
- 19 April 2023
- Published by Elsevier in Expert Systems with Applications
- Vol. 227
Deep learning-based prediction framework of temperature control time for wide-thick slab hot rolling production
- 19 April 2023
- Published by Elsevier in Expert Systems with Applications
- Vol. 227
Deep learning-based prediction framework of temperature control time for wide-thick slab hot rolling production
- Retracted
- 7 January 2023
- Published by Emerald Publishing in International Journal of Emerging Markets
- Vol. 21 (1) , 1-19
RETRACTED: Blockchain technology adoption in Halal traceability scheme of the food supply chain: evidence from Indonesian firms
Purpose: The paper examines the intent to adopt blockchain-facilitated Halal traceability (BFHT) scheme in Indonesian firms' Halal food supply chain (SC). This study integrates Halal-focused attitude, innovation diffusion and institutional theories to construct the model. Design/methodology/approach: Data collection uses a simple random sampling method. Respondents are company leaders with experience and knowledge regarding Halal SC. The SEM-PLS approach was applied to test the hypothetical structure. Findings: The intent to adopt BFHT is considerably affected by perceived attractiveness, as perceived attractiveness is considerably affected by institutional forces, which are significantly influenced by Halal-focused attitude. Firms that follow a completely Halal-focused attitude show higher awareness regarding institutional forces that motivate them to adopt a BFHT. Originality/value: This research is among the initial works regarding Halal SCs that integrate Halal-focused attitude, innovation diffusion and institutional theories to recognise firms' intent to adopt a BFHT scheme.
- 7 January 2023
- Published by Emerald Publishing in International Journal of Emerging Markets
- Vol. 21 (1) , 1-19
RetractedRETRACTED: Blockchain technology adoption in Halal traceability scheme of the food supply chain: evidence from Indonesian firms
Purpose: The paper examines the intent to adopt blockchain-facilitated Halal traceability (BFHT) scheme in Indonesian firms' Halal food supply chain (SC). This study integrates Halal-focused attitude, innovation diffusion and institutional theories to construct the model. Design/methodology/approach: Data collection uses a simple random sampling method. Respondents are company leaders with experience and knowledge regarding Halal SC. The SEM-PLS approach was applied to test the hypothetical structure. Findings: The intent to adopt BFHT is considerably affected by perceived attractiveness, as perceived attractiveness is considerably affected by institutional forces, which are significantly influenced by Halal-focused attitude. Firms that follow a completely Halal-focused attitude show higher awareness regarding institutional forces that motivate them to adopt a BFHT. Originality/value: This research is among the initial works regarding Halal SCs that integrate Halal-focused attitude, innovation diffusion and institutional theories to recognise firms' intent to adopt a BFHT scheme.
- 1 December 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 148-151
Genetic Programming-based Heuristic Generation Algorithm for Steelmaking - Continuous Casting Scheduling
This paper deals with the special mixed flow shop scheduling problem of steelmaking and continuous casting, establishing the SCC production scheduling solution framework based on charge sequencing rules and device assignment rules, and proposing a heuristic generation algorithm of SCC based on GP. The algorithm can automatically generate scheduling heuristic rules suitable for production scenarios. The simulation experiment is carried out with the actual production data of one refining steel mill, The experimental results show that the scheduling rules generated by the heuristic generation algorithm based on GP have better performance than the benchmarking rules in actual production environment, and with the increase of examples, the performance advantage of generated rules are more obvious and stable.
- 1 December 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 148-151
Genetic Programming-based Heuristic Generation Algorithm for Steelmaking - Continuous Casting Scheduling
This paper deals with the special mixed flow shop scheduling problem of steelmaking and continuous casting, establishing the SCC production scheduling solution framework based on charge sequencing rules and device assignment rules, and proposing a heuristic generation algorithm of SCC based on GP. The algorithm can automatically generate scheduling heuristic rules suitable for production scenarios. The simulation experiment is carried out with the actual production data of one refining steel mill, The experimental results show that the scheduling rules generated by the heuristic generation algorithm based on GP have better performance than the benchmarking rules in actual production environment, and with the increase of examples, the performance advantage of generated rules are more obvious and stable.