Abstract
The corrosion rate of rebar during the various stages where it occurs, such as passivation, initiation of corrosion and severe corrosion, needs to be determined non-destructively for the maintenance, restoration and replacement of concrete structures. The double layer capacitance (Cdl) and the charge transfer resistance or polarisation resistance (Rp) of the corrosion processes have been associated with the slope of the low-frequency arc in the Nyquist plot, and this can be related to the electrochemical phenomenon that occurs at the steel–concrete interface. The present studies, based on electrochemical impedance spectroscopy (EIS) conducted on three different densities of concrete with addition of 0·5 and 1% chloride over a period of 1765 days, reveal that the capacitive behaviour of a low-frequency arc with a slope more than −1 indicates the passive condition of rebar. Warburg diffusion behaviour with a slope exactly equal to −1 denotes the initiation of corrosion on the rebar. A slope of less than −1 is obtained when corrosion spreads uniformly on the rebar. Other electrochemical parameters such as Rp, Cdl and phase angle are correlated with the phenomenon occurring at the steel–concrete interface. An Rp value greater than 250 kΩ cm2 indicates the passive condition of rebar, whereas values of less than 230 and 14 kΩ cm2 indicate initiation and severe corrosion of the rebar respectively. Similarly, a Cdl value greater than 1000 μF/cm2 indicates the severe corrosion of rebar, whereas less than 100 μF/cm2 denotes the passive condition of rebar. If the rebar is in the passive condition, the phase angle is more than 30°, whereas it is less than 20° under severe corrosion. The reduction of intrinsic chloride diffusivity owing to pore restructuring by pozzolanic reaction and adsorption of a greater amount of chloride ions into the interlayer of additional calcium silicate hydrate content are responsible for delayed initiation of corrosion in Portland pozzolana cement (PPC) and Portland slag cement (PSC) concretes, when compared with ordinary Portland cement (OPC) concrete.Keywords
This publication has 36 references indexed in Scilit:
- Performance evaluation of rebar in chloride contaminated concrete by corrosion rateConstruction and Building Materials, 2009
- Corrosion rate evolution in concrete structures exposed to the atmosphereCement and Concrete Composites, 2002
- The participation of bound chloride in passive film breakdown on steel in concreteCorrosion Science, 2000
- Differential acid neutralisation analysisCement and Concrete Research, 1999
- Cement paste hardening process studied by impedance spectroscopyElectrochimica Acta, 1999
- Chloride binding in GGBS concreteCement and Concrete Research, 1996
- Cover cracking as a function of bar corrosion: Part I-Experimental testMaterials and Structures, 1993
- Constant phase angle behavior of SnO2/WO3 thin film electrodes in anhydrous LiClO4—propylene carbonate electrolyteElectrochimica Acta, 1993
- Electrochemical Measurements on Concrete Bridges for Evaluation of Reinforcement Corrosion RatesCorrosion, 1993
- Determining polarization resistance in reinforced concrete slabsCorrosion Science, 1989