A Combined Discrete Element-Finite Difference Model for Simulation of Double Shield TBM excavation in Jointed Rocks
Author:
- 7 July 2021
- journal article
- research article
- Published by Springer Nature in Rock Mechanics and Rock Engineering
- Vol. 54 (11) , 5867-5883
Abstract
No abstract availableKeywords
This publication has 27 references indexed in Scilit:
- Correction of the probabilistic density function of discontinuities spacing considering the statistical error based on negative exponential distributionJournal of Structural Geology, 2012
- Tunnel boring machines under squeezing conditionsTunnelling and Underground Space Technology, 2010
- Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance projectTunnelling and Underground Space Technology, 2009
- Improved Longitudinal Displacement Profiles for Convergence Confinement Analysis of Deep TunnelsRock Mechanics and Rock Engineering, 2009
- The Effect of the Stress Path on Squeezing Behavior in TunnelingRock Mechanics and Rock Engineering, 2008
- Numerical modelling of three-dimension stress rotation ahead of an advancing tunnel faceInternational Journal of Rock Mechanics and Mining Sciences, 2001
- Application of the Convergence-Confinement method of tunnel design to rock masses that satisfy the Hoek-Brown failure criterionTunnelling and Underground Space Technology, 2000
- Use of the distinct element method to perform stress analysis in rock with non-persistent joints and to study the effect of joint geometry parameters on the strength and deformability of rock massesRock Mechanics and Rock Engineering, 1992
- Probabilistic modelling of joint orientationInternational Journal for Numerical and Analytical Methods in Geomechanics, 1990
- Discontinuity spacings in rockInternational Journal of Rock Mechanics and Mining Sciences, 1976