Determining Project Contingency Reserve Using a Fuzzy Arithmetic-Based Risk Analysis Method
Open Access
- 1 January 2020
- conference paper
- Published by HICSS Conference Office
Abstract
Traditional techniques for estimating contingency reserve fail to capture subjective uncertainties and expert knowledge, and they rely on historical data. This paper proposes a fuzzy risk analysis model (FRAM) that uses fuzzy arithmetic to analyze risk and opportunity events and determine construction project contingency reserve. The FRAM allows experts to use natural language to assess the probability and impact of risk and opportunity events by employing linguistic scales represented by fuzzy numbers, thus addressing the data reliance problem of probabilistic methods. It enables experts to customize linguistic scales and fuzzy numbers for different project types and stages. The FRAM also deals with the challenges associated with deterministic approaches by addressing measurement imprecision and the subjective uncertainty of experts' opinions. Moreover, the FRAM allows analysts to estimate contingency at different levels of confidence. This paper also illustrates Fuzzy Risk Analyzer © (FRA ©), software that implements the fuzzy arithmetic procedure of the FRAM.Keywords
This publication has 16 references indexed in Scilit:
- The simulation-fuzzy method of assessing the risk of air traffic accidents using the fuzzy risk matrixSafety Science, 2016
- A contingency estimation model for software projectsInternational Journal of Project Management, 2013
- Developing a Tω (the weakest t-norm) fuzzy GERT for evaluating uncertain process reliability in semiconductor manufacturingApplied Soft Computing, 2011
- A fuzzy approach to construction project risk assessmentInternational Journal of Project Management, 2011
- Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHPJournal of Construction Engineering and Management, 2010
- Using Risk Analysis to Determine Construction Project ContingenciesJournal of Construction Engineering and Management, 2000
- On the use of probabilistic and deterministic methods in risk analysisJournal of Loss Prevention in the Process Industries, 1999
- Project-Network Analysis Using Fuzzy Sets TheoryJournal of Construction Engineering and Management, 1996
- Pattern Recognition with Fuzzy Objective Function Algorithms1981
- The concept of a linguistic variable and its application to approximate reasoning—IInformation Sciences, 1975