Nasir Bedewi Siraj
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Nasir Bedewi Siraj has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Aminah Robinson Fayek
Hole School of Construction Engineering, Department of Civil and Environmental Engineering, University of Alberta, 7-203 Donadeo Innovation Centre for Engineering, 9211 116 St NW, Edmonton, AB T6G 1H9, Canada
3 shared publications Andrew Johnston
University of Alberta University of Alberta University of Alberta University of Alberta
1 shared publication- Nebiyu Kedir
Department of Civil and Environmental Engineering, University of Alberta, Edmonton, AB T6G 1H9, Canada
1 shared publication - Seyed Hamed Fateminia
University of Alberta University of Alberta University of Alberta University of Alberta
1 shared publication
Latest Publications
- Open Access
- 5 May 2023
- Published by Wiley in Advances in Civil Engineering
- Vol. 2023, 1-22
Application of System Dynamics in Construction Engineering and Management: Content Analysis and Systematic Literature Review
Researchers have increasingly used system dynamics (SD) as a modelling tool to understand the behaviour of systems with varying degrees of dynamism and complexity. SD has had a particularly significant impact in improving system representation, modelling, and abstraction of problems within the construction domain. However, there is a lack of comprehensive systematic literature review and content analysis on application of SD in construction engineering and management (CEM). In this study, a systematic literature review and content analysis were used to investigate 213 journal articles published from 1995 through 2021, presenting applications of SD in CEM research. This included analysis of SD research in terms of contributing authors and their affiliations; identifying the major CEM research areas and patterns of SD research within those areas; study of the current focus of SD research, future trends, and potential for future research in these CEM areas; investigating the SD modelling paradigm in terms of hybridization with other modelling techniques; and a review of issues and challenges of SD modelling. This study contributes to the body of knowledge by (1) addressing the lack of a comprehensive systematic review and content analysis in the application of SD in CEM research, (2) providing construction researchers and practitioners with the state-of-the-art in SD research and application within the construction industry, and (3) assessing the potential for SD hybridization with other modelling approaches and proposing areas of future research to improve SD modelling capabilities. This study found that (1) the concept of SD was mostly used in the research areas of decision making and policy analysis, performance, and rework and change, (2) the areas of scheduling and health and safety have acquired more interest in SD relative to previous trends, and (3) researchers have the lowest interest in the research area of bidding and procurement.
- 5 May 2023
- Published by Wiley in Advances in Civil Engineering
- Vol. 2023, 1-22
Open AccessApplication of System Dynamics in Construction Engineering and Management: Content Analysis and Systematic Literature Review
Researchers have increasingly used system dynamics (SD) as a modelling tool to understand the behaviour of systems with varying degrees of dynamism and complexity. SD has had a particularly significant impact in improving system representation, modelling, and abstraction of problems within the construction domain. However, there is a lack of comprehensive systematic literature review and content analysis on application of SD in construction engineering and management (CEM). In this study, a systematic literature review and content analysis were used to investigate 213 journal articles published from 1995 through 2021, presenting applications of SD in CEM research. This included analysis of SD research in terms of contributing authors and their affiliations; identifying the major CEM research areas and patterns of SD research within those areas; study of the current focus of SD research, future trends, and potential for future research in these CEM areas; investigating the SD modelling paradigm in terms of hybridization with other modelling techniques; and a review of issues and challenges of SD modelling. This study contributes to the body of knowledge by (1) addressing the lack of a comprehensive systematic review and content analysis in the application of SD in CEM research, (2) providing construction researchers and practitioners with the state-of-the-art in SD research and application within the construction industry, and (3) assessing the potential for SD hybridization with other modelling approaches and proposing areas of future research to improve SD modelling capabilities. This study found that (1) the concept of SD was mostly used in the research areas of decision making and policy analysis, performance, and rework and change, (2) the areas of scheduling and health and safety have acquired more interest in SD relative to previous trends, and (3) researchers have the lowest interest in the research area of bidding and procurement.
- Open Access
- 1 January 2020
- Published by HICSS Conference Office
Determining Project Contingency Reserve Using a Fuzzy Arithmetic-Based Risk Analysis Method
Traditional techniques for estimating contingency reserve fail to capture subjective uncertainties and expert knowledge, and they rely on historical data. This paper proposes a fuzzy risk analysis model (FRAM) that uses fuzzy arithmetic to analyze risk and opportunity events and determine construction project contingency reserve. The FRAM allows experts to use natural language to assess the probability and impact of risk and opportunity events by employing linguistic scales represented by fuzzy numbers, thus addressing the data reliance problem of probabilistic methods. It enables experts to customize linguistic scales and fuzzy numbers for different project types and stages. The FRAM also deals with the challenges associated with deterministic approaches by addressing measurement imprecision and the subjective uncertainty of experts' opinions. Moreover, the FRAM allows analysts to estimate contingency at different levels of confidence. This paper also illustrates Fuzzy Risk Analyzer © (FRA ©), software that implements the fuzzy arithmetic procedure of the FRAM.
- 1 January 2020
- Published by HICSS Conference Office
Open AccessDetermining Project Contingency Reserve Using a Fuzzy Arithmetic-Based Risk Analysis Method
Traditional techniques for estimating contingency reserve fail to capture subjective uncertainties and expert knowledge, and they rely on historical data. This paper proposes a fuzzy risk analysis model (FRAM) that uses fuzzy arithmetic to analyze risk and opportunity events and determine construction project contingency reserve. The FRAM allows experts to use natural language to assess the probability and impact of risk and opportunity events by employing linguistic scales represented by fuzzy numbers, thus addressing the data reliance problem of probabilistic methods. It enables experts to customize linguistic scales and fuzzy numbers for different project types and stages. The FRAM also deals with the challenges associated with deterministic approaches by addressing measurement imprecision and the subjective uncertainty of experts' opinions. Moreover, the FRAM allows analysts to estimate contingency at different levels of confidence. This paper also illustrates Fuzzy Risk Analyzer © (FRA ©), software that implements the fuzzy arithmetic procedure of the FRAM.
- 24 May 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 2411-2421
Fuzzy System Dynamics for Modeling Construction Risk Management
The unique nature of construction projects and uncertainties during project execution make construction a highly risk-prone industry. The system dynamics (SD) approach, which focuses on the cause-effect relationship of model variables, is a viable option to model and analyze construction risks, which are considered to be highly dynamic, and has the ability to capture the interrelationships and interactions among different risks. However, conventional SD has a limited ability to handle risk imprecision and uncertainty; these elements can be best dealt with using fuzzy logic. Research endeavors to integrate SD and fuzzy logic so as to address the shortcomings of SD in construction risk modeling and analysis are very few. In this paper, a methodology for developing a fuzzy system dynamics (FSD) framework is proposed that combines the strengths of SD with those of fuzzy logic to improve construction risk modeling and develop risk mitigation strategies. The main contributions of this paper are: (1) identifying research gaps in FSD modeling; (2) providing a systematic and detailed methodology for developing the FSD framework; and (3) examining existing approaches for representing fuzzy variables and fuzzy rules, and the impact of different fuzzy arithmetic operators and defuzzification methods in FSD models.
- 24 May 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 2411-2421
Fuzzy System Dynamics for Modeling Construction Risk Management
The unique nature of construction projects and uncertainties during project execution make construction a highly risk-prone industry. The system dynamics (SD) approach, which focuses on the cause-effect relationship of model variables, is a viable option to model and analyze construction risks, which are considered to be highly dynamic, and has the ability to capture the interrelationships and interactions among different risks. However, conventional SD has a limited ability to handle risk imprecision and uncertainty; these elements can be best dealt with using fuzzy logic. Research endeavors to integrate SD and fuzzy logic so as to address the shortcomings of SD in construction risk modeling and analysis are very few. In this paper, a methodology for developing a fuzzy system dynamics (FSD) framework is proposed that combines the strengths of SD with those of fuzzy logic to improve construction risk modeling and develop risk mitigation strategies. The main contributions of this paper are: (1) identifying research gaps in FSD modeling; (2) providing a systematic and detailed methodology for developing the FSD framework; and (3) examining existing approaches for representing fuzzy variables and fuzzy rules, and the impact of different fuzzy arithmetic operators and defuzzification methods in FSD models.