High Power Travelling Wave Ring for Testing Rf Components at TARLA
Author:
- 30 June 2026
- journal article
- Published by Communications Faculty of Sciences University of Ankara Series A2-A3 Physical Sciences and Engineering in Communications Faculty of Sciences University of Ankara Series A2-A3 Physical Sciences and Engineering
- Vol. 68 (1) , 75-91
Abstract
TARLA (Turkish Accelerator and Radiation Laboratory) is the first accelerator-based light source user facility in Türkiye. It is designed to produce free electron laser (FEL) radiation in the mid-infrared region, spanning wavelengths from 5 to 350 μm, as well as Bremsstrahlung radiation in the 10-30 MeV energy range, utilizing electron beams with energies between 10 and 40 MeV for fundamental and applied research. The facility will accommodate four experimental stations alongside an FEL diagnostics laboratory. Currently, two stations, dedicated to advanced material science and material characterization, are under preparation for user experiments. Additionally, TARLA incorporates a dedicated radiofrequency (RF) infrastructure designed to facilitate high-power RF research. As part of this infrastructure, a microwave pulse compressor system has been designed and implemented. To further enhance high-power RF testing capabilities, two resonant ring test bench configurations, employing closed-loop waveguide structures, were conceived and subjected to comprehensive electromagnetic simulations. Comparative evaluation of these designs indicated that one of the resonant rings, featuring a hybrid coupler integrated with a manual phase shifter, demonstrates superior resonance precision and power saturation characteristics. This configuration attains a power gain of approximately 11–12 dB, thereby enabling effective signal amplification and stable operation for device under test (DUT) assessments at elevated RF power levels. The selected resonant ring architecture offers a technically robust and cost-efficient solution for high-power RF component testing, addressing critical needs in accelerator technology and allied domains such as radar systems, vacuum electronics, and aerospace applications. This study details the design methodology, simulation procedures, and performance optimization of the chosen resonant ring test bench slated for deployment at TARLA.Keywords
Funding Information
- This work was supported by the Presidency Strategy and Budget Directorate of Türkiye and the Scientific and Technological Research Council of Turkiye (Not Applicable)
This publication has 22 references indexed in Scilit:
- Design and cold model experiment of a continuous-wave deuteron radio-frequency quadrupolePhysical Review Accelerators and Beams, 2017
- Design of high power RF amplifier for 3 MW/CW transmission line test rigFusion Engineering and Design, 2017
- Development of traveling wave resonator based test bed for high power transmission line component testingAIP Conference Proceedings, 2015
- On using a traveling-wave resonator for high-power testing of millimeter-wave ECH components2012
- Status of the IHEP 1.3 GHz superconducting RF programScience China Physics, Mechanics & Astronomy, 2011
- Systematic Engineering of Waveguide-Resonator Coupling for Silicon Microring/Microdisk/Racetrack Resonators: Theory and ExperimentIEEE Journal of Quantum Electronics, 2010
- 200 MW S-band traveling wave resonant ring development at IHEPChinese Physics C, 2010
- Study of the ELBE RF-couplers with a new 1.3 GHz RF-coupler test bench driven by a resonant ringNuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2010
- The Turkish accelerator complex IR FEL projectInfrared Physics & Technology, 2008
- Theory of Electron Beam Loading in Linear AcceleratorsProceedings of the Physical Society. Section B, 1954