A constraint programming model for the scheduling of JIT cross-docking systems with preemption
Authors:
- Fazel ZarandiFZFazel Zarandi
- M. H.MHM. H.
- 11 January 2014
- journal article
- research article
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 27 (2) , 297-313
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- Cross-docking: State of the artOmega, 2012
- Rule-based modeling and constraint programming based solution of the assembly line balancing problemExpert Systems with Applications, 2012
- Optimizing project selection and scheduling problems with time-dependent resource constraintsAutomation in Construction, 2011
- A bounded dynamic programming approach to schedule operations in a cross docking platformComputers & Industrial Engineering, 2011
- Cross dock scheduling: Classification, literature review and research agendaOmega, 2010
- Vehicle routing scheduling using an enhanced hybrid optimization approachJournal of Intelligent Manufacturing, 2010
- A multi-criteria cross-docking scheduling with just-in-time approachThe International Journal of Advanced Manufacturing Technology, 2009
- Minimizing the makespan in a two-machine cross-docking flow shop problemEuropean Journal of Operational Research, 2009
- Designing an integrated multi-echelon agile supply chain network: a hybrid taguchi-particle swarm optimization approachJournal of Intelligent Manufacturing, 2008
- Constraint satisfaction problems: Algorithms and applicationsEuropean Journal of Operational Research, 1999