A dynamic critical path method for project scheduling based on a generalised fuzzy similarity
Authors:
- 1 February 2020
- journal article
- research article
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 72 (2) , 458-470
Abstract
According to the project non-repeatability and their implementation environment uncertainty, this paper aims to propose a new fuzzy node labelling method. The method, with a dynamic perspective, quickly provides the effective solutions of the critical path and total duration for projects, and fully considers the fact that critical paths may change in a fuzzy environment. The proposed method incorporates the fuzzy concept into the dynamic idea, which improves the objectivity and “accuracy” of the analysis. Meanwhile, vector integration similarity algorithm (VISA) achieves multiple generalized trapezoidal fuzzy numbers ordering by integrating the norm and direction similarities of fuzzy vectors. VISA demonstrates its superiority by analyzing typical examples. Since there is no need to consider nodes that have no direct precedence relation with source nodes, this method is particularly suitable for quickly identifying the critical path of fuzzy project networks with multiple time parameters and complex precedence relation.Keywords
This publication has 29 references indexed in Scilit:
- FUZZY CRITICAL PATH PROBLEM FOR PROJECT NETWORKInternational Journal of Pure and Apllied Mathematics, 2013
- Fuzzy critical path analysis based on centroid of centroids of fuzzy numbers and new subtraction methodInternational Journal of Mathematics in Operational Research, 2013
- A new approach for solving fuzzy critical path problem using analysis of eventsExpert Systems with Applications, 2011
- Fuzzy risk analysis based on ranking generalized fuzzy numbers with different heights and different spreadsExpert Systems with Applications, 2009
- Analysis of critical paths in a project network with fuzzy activity timesEuropean Journal of Operational Research, 2007
- A simple approach to fuzzy critical path analysis in project networksApplied Mathematical Modelling, 2007
- Critical path analysis in the network with fuzzy activity timesFuzzy Sets and Systems, 2001
- Fuzzy critical path method based on signed distance ranking of fuzzy numbersIEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans, 2000
- Multiobjective programming in optimization of interval objective functions — A generalized approachEuropean Journal of Operational Research, 1996
- Multiobjective programming in optimization of the interval objective functionEuropean Journal of Operational Research, 1990