Dajiang Liu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Dajiang Liu has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
Changming Hu
School of Architecture and Construction, Xi’an University of Architecture and Technology, Xi’an, Shanxi, People’s Republic of China
1 shared publication- Changming Hu
College of Civil Engineering, Xi’an University of Architecture and Technology, Xi’an 710055, China
1 shared publication
Latest Publications
- 1 February 2020
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 72 (2) , 458-470
A dynamic critical path method for project scheduling based on a generalised fuzzy similarity
According to the project non-repeatability and their implementation environment uncertainty, this paper aims to propose a new fuzzy node labelling method. The method, with a dynamic perspective, quickly provides the effective solutions of the critical path and total duration for projects, and fully considers the fact that critical paths may change in a fuzzy environment. The proposed method incorporates the fuzzy concept into the dynamic idea, which improves the objectivity and “accuracy” of the analysis. Meanwhile, vector integration similarity algorithm (VISA) achieves multiple generalized trapezoidal fuzzy numbers ordering by integrating the norm and direction similarities of fuzzy vectors. VISA demonstrates its superiority by analyzing typical examples. Since there is no need to consider nodes that have no direct precedence relation with source nodes, this method is particularly suitable for quickly identifying the critical path of fuzzy project networks with multiple time parameters and complex precedence relation.
- 1 February 2020
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 72 (2) , 458-470
A dynamic critical path method for project scheduling based on a generalised fuzzy similarity
According to the project non-repeatability and their implementation environment uncertainty, this paper aims to propose a new fuzzy node labelling method. The method, with a dynamic perspective, quickly provides the effective solutions of the critical path and total duration for projects, and fully considers the fact that critical paths may change in a fuzzy environment. The proposed method incorporates the fuzzy concept into the dynamic idea, which improves the objectivity and “accuracy” of the analysis. Meanwhile, vector integration similarity algorithm (VISA) achieves multiple generalized trapezoidal fuzzy numbers ordering by integrating the norm and direction similarities of fuzzy vectors. VISA demonstrates its superiority by analyzing typical examples. Since there is no need to consider nodes that have no direct precedence relation with source nodes, this method is particularly suitable for quickly identifying the critical path of fuzzy project networks with multiple time parameters and complex precedence relation.
- 1 September 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 144 (9)
Improved Critical Path Method with Trapezoidal Fuzzy Activity Durations
The critical path method is an essential tool for project planning, control, and scheduling. But when it is applied to analyze the critical path of project networks with fuzzy activity durations, two key issues need to be settled properly: sorting fuzzy numbers and avoiding the fuzzy subtraction operation to generate negative, infeasible solutions. In view of this, this study proposes an improved fuzzy critical path method. The primary contributions this research makes to the body of knowledge are as follows: an integrated vector similarity algorithm is used to resolve the sorting problem of fuzzy durations, while the improved standard algorithm for fuzzy subtraction is to circumvent the negative, infeasible solutions generated in fuzzy subtraction operation; moreover, this method analyzes and depicts the change of critical path under the fuzzy state of activity duration, which fills the knowledge gaps. The empirical analysis indicates that the inference and computation of this method are relatively objective and easy to implement, the effectiveness and practicability of which are further verified in practice.
- 1 September 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 144 (9)
Improved Critical Path Method with Trapezoidal Fuzzy Activity Durations
The critical path method is an essential tool for project planning, control, and scheduling. But when it is applied to analyze the critical path of project networks with fuzzy activity durations, two key issues need to be settled properly: sorting fuzzy numbers and avoiding the fuzzy subtraction operation to generate negative, infeasible solutions. In view of this, this study proposes an improved fuzzy critical path method. The primary contributions this research makes to the body of knowledge are as follows: an integrated vector similarity algorithm is used to resolve the sorting problem of fuzzy durations, while the improved standard algorithm for fuzzy subtraction is to circumvent the negative, infeasible solutions generated in fuzzy subtraction operation; moreover, this method analyzes and depicts the change of critical path under the fuzzy state of activity duration, which fills the knowledge gaps. The empirical analysis indicates that the inference and computation of this method are relatively objective and easy to implement, the effectiveness and practicability of which are further verified in practice.