Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects
- 1 July 2009
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (7) , 601-608
Abstract
Highway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as A+B contracting to expedite construction. Although many of these contracting methods rely on the RUC to determine incentives or disincentives, no standard method for RUC calculation is available to FDOT district engineers. In addition, existing methods are neither practical nor user-friendly for determining incentives or disincentives. This study intends to develop a RUC calculation procedure for the FDOT that focuses on using data that are easily accessible to FDOT district engineers, such as drawings and maintenance of traffic plans. The procedure is developed based on traffic analysis methods published in the Highway Capacity Manual, previous studies on user benefit analysis and work zones, and empirical ...Keywords
This publication has 3 references indexed in Scilit:
- Use of Conceptual Road User Costs for a Rapid Roadway Construction Decision Making System2005
- Construction Work Zone Safety2003
- Incentive/Disincentive Provisions in Highway ContractsJournal of Construction Engineering and Management, 1997